Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 This operator is no longer active in the State of Colorado.
 Surface Location
 API# 05-087-05377
Well Classification: OW Status: SI - 1/1/2020
Well Name/No:HOUGH, R.M. #B-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PCR OPERATING LLC - 10657
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2020
FacilityID:224984LocationID:313728
County:MORGAN #087Location:SWNE 7 1N57W 6
Field:ADENA - #700Elevation:4484 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2303FNL  1635 FELLat/Long: 40.066860 / -103.798470Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.066860 / -103.798470Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 1/1/2020             Measured TD: 5635 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 1/1/2020
Wellbore Permit
Permit #: Expiration Date:9/15/2013
Proposed Depth/Form:5635 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: DJSND , Formation: D & J SAND , Order: 0 , Unit Acreage: 0, Drill Unit:
Formation And Spacing:Code: DSND , Formation: D SAND , Order: 26-1 , Unit Acreage: 40, Drill Unit: SWNE
Casing:String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 104 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 65, Top: 0 ft., Bottom: 104 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5631 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 275, Top: , Bottom: 5631 ft.

Wellbore Completed
Completion Date:3/16/1954
Spud Date:2/24/1954Spud Date Is:ACTUAL
Measured TD:5635 ft.Measured PB depth:0 ft.
True Vertical TD:True Vertical PB depth:
Log Types:ELECTRICAL AND MICRO
Casing:String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 104 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 65, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: , Size: 5.5 in., Top: 0 ft., Depth: 5631 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
NIOBRARA4658 ft.
CARLILE5095 ft.
D SAND5484 ft.Y
J SAND5510 ft.Y

Formation JSND                     Formation Classification:  OW                     Status:  AB - 1/21/2013                 Interval Top: 5554 ft.    Interval Bottom: 5562 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/21/2013Treatment End Date:N/A
Treatment Summary:Set CIBP between D & J. Shoot D-Sand and return to production.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/21/2011
Treatment Summary:Set a CIBP at 5595' over the existing perforations (5566-5584'). Perforated from 5554 to 5562'. Swab tested new perfs and put well on production.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 23
BBLS_OIL 5
CALC_BBLS_H2O 69
CALC_BBLS_OIL 15
CALC_GOR 496
CASING_PRESS 840
GRAVITY_OIL 42
TUBING_PRESS 220
Perforation Data:
Interval Top:5554 ft.# Of Holes:32
Interval Bottom:5562 ft.Hole Size:0.42 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
12/31/2019
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No