Wellbore #00 Wellbore Classification: ERIW Status: IJ - 12/1/2022 Measured TD: 5800 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: ERIW IJ - 12/1/2022 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 3/1/2020 | | Proposed Depth/Form: | 5780 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 95 ft., Weight: 28 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 95 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5795 ft., Weight: 15.5 , Citings Type: PLANNED | | Cement: | Sacks: 275, Top: 4200 ft., Bottom: 5795 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/2/2018 | | Spud Date: | 2/12/1954 | Spud Date Is: | ACTUAL | | Measured TD: | 5800 ft. | Measured PB depth: | 5755 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Log Types: | ELEC | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 8.625 in., Top: 0 ft., Depth: 95 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 95 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5800 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 5110 ft., Bottom: 5800 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 5 in., Size: 4.5 in., Top: 0 ft., Depth: 5755 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 5755 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST LINER , Top: 0 ft., Depth: , Bottom: 5755 ft., Sacks: 200, Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 4765 ft. | | | | | FORT HAYS | 5168 ft. | | | | | CARLILE | 5215 ft. | | | | | GREENHORN | 5265 ft. | | | | | BENTONITE | 5523 ft. | | | | | D SAND | 5620 ft. | 5666 ft. | N | N | | J SAND | 5690 ft. | | | |
Formation JSND Formation Classification: ERIW Status: IJ - 12/1/2022 Interval Top: 5727 ft. Interval Bottom: 5746 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/10/2018 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 4/6/2018 | Treatment End Date: | 4/6/2018 | | Treatment Summary: | PUMPED 1 BBL WATER TO LOAD ANNULUS,
PRESSURED UP TO 500 PSI,
15 MIN TEST @ 480 PSI, RIG UP TO TBG.
PUMP ACID JOB & STEP RATE TEST 1000 Gallons (24.0 bbls) 7.5% HCL, 10% Acetic, 1260 gallons (30 bbls) flush
Followed acid job with injection test (Step Rate Test) - 703 bbls fresh water
| | Total fluid used in treatment (bbls): | 54 | Max pressure during treatment (psi): | 2092 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 30 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 3/7/1954 | | Treatment Summary: | None |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5663 ft. | | Tubing Packer Depth: | 5663 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 5727 ft. | # Of Holes: | 114 | | Interval Bottom: | 5746 ft. | Hole Size: | |
|
Formation DSND Formation Classification: OW Status: AB - 4/23/2018 Interval Top: 5634 ft. Interval Bottom: 5646 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 5/1/1990 | Choke Size: | | | Formation Name: | D SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/1/1990 | | Treatment Summary: | 1000 gal 20% FE acid |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 200 | | CALC_GOR | 400 | | GRAVITY_OIL | 44 | | MCF_GAS | 80 | | TUBING_PRESS | 225 |
| | Perforation Data: | | Interval Top: | 5634 ft. | # Of Holes: | 48 | | Interval Bottom: | 5646 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (UIC) | Y | Last Use 07/31/2024 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|