|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 11/1/2015 Measured TD: 5605 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 11/1/2015 | | Wellbore Permit | | | Permit #: | 19540000 | Expiration Date: | 8/13/1954 | | Proposed Depth/Form: | 5600 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | ADENA J SAND UNIT | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 26-1 , Unit Acreage: 40, Drill Unit: S.17:NWSE |
| | |
| Wellbore Completed | | Completion Date: | 4/21/1954 | | Spud Date: | 4/10/1954 | Spud Date Is: | ACTUAL | | Measured TD: | 5605 ft. | Measured PB depth: | 0 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | ELECTRICAL | | Casing: | String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 97 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 115, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: , Size: 5.5 in., Top: 0 ft., Depth: 5605 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 4575 ft. | | N | N | | FORT HAYS | 4991 ft. | | N | N | | CODELL | 5029 ft. | | N | N | | GREENHORN | 5113 ft. | | N | N | | BENTONITE | 5345 ft. | | N | N | | D SAND | 5438 ft. | | Y | N | | J SAND | 5502 ft. | | Y | Y |
Formation JSND Formation Classification: GW Status: SI - 11/1/2015 Interval Top: 5501 ft. Interval Bottom: 5517 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/10/1954 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 2/20/2014 | Treatment End Date: | N/A | | Treatment Summary: | This well had been shut-in for over 25 years. The original surface equipment was removed prior to our purchase of the field in July 2011. We recently reactivated this well as a flowing producing gas well from the original perforations. The well came on natural - no treatment was necessary. We have set a separator and water tank where the equiment was orignally set - there is no new surface disturbance, no pit, no drilling. We also ran a COGCC witnessed MIT on 3/29/14. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5462 ft. | | Tubing Packer Depth: | 5462 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/20/2014 | Test Method: | flow to sales | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BTU_GAS | 1184 | | CALC_BBLS_H2O | 5 | | CALC_MCF_GAS | 354 | | CASING_PRESS | 500 | | GRAVITY_OIL | 42 | | MCF_GAS | 354 | | TUBING_PRESS | 1300 |
| | Perforation Data: | | Interval Top: | 5501 ft. | # Of Holes: | 96 | | Interval Bottom: | 5517 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 09/30/2015 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|