|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: ERIW Status: IJ - 12/1/2022 Measured TD: 5810 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: ERIW IJ - 12/1/2022 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 12/30/2014 | | Proposed Depth/Form: | 5810 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 26-60 , Unit Acreage: 1200, Drill Unit: see order 26-60 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 0, Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 93 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 90, Top: 0 ft., Bottom: 93 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5708 ft., Weight: 15.5 , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4073 ft., Bottom: 5708 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/20/1954 | | Spud Date: | 7/13/1954 | Spud Date Is: | ACTUAL | | Measured TD: | 5810 ft. | Measured PB depth: | 5773 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 93 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 90, Top: 0 ft., Bottom: 93 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5805 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 4630 ft., Bottom: 5805 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 5 in., Size: 4.5 in., Top: 0 ft., Depth: 5790 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 145, Top: 0 ft., Bottom: 5790 ft., Determination Method: VISU | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 4788 ft. | | | | | FORT HAYS | 5191 ft. | | | | | CARLILE | 5240 ft. | | | | | GREENHORN | 5298 ft. | | | | | BENTONITE | 5546 ft. | | | | | D SAND | 5642 ft. | | | | | J SAND | 5711 ft. | | | |
Formation JSND Formation Classification: ERIW Status: IJ - 12/1/2022 Interval Top: 5728 ft. Interval Bottom: 5740 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/6/2018 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/8/2019 | Treatment End Date: | N/A | | Treatment Summary: | No treatment - perfed and started injection - 11/6/18 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | | | Treatment Date: | 8/1/2018 | Treatment End Date: | N/A | | Treatment Summary: | No treatment - J Sand perfs @ 5728-5740 w/ 6 spf | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.75 in. | Tubing Setting Depth: | 5681 ft. | | Tubing Packer Depth: | 5681 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 5728 ft. | # Of Holes: | 72 | | Interval Bottom: | 5740 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (UIC) | Y | Last Use 07/31/2024 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|