Wellbore #00 Wellbore Classification: ERIW Status: IJ - 12/1/2022 Measured TD: 5800 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: ERIW IJ - 12/1/2022 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 3/5/2020 | | Proposed Depth/Form: | 5800 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 26-60 , Unit Acreage: 1200, Drill Unit: Sec 24:NW4,N2SW4,E2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 100 ft., Weight: 28 , Citings Type: PLANNED | | Cement: | Sacks: 75, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5793 ft., Weight: 15.5 , Citings Type: PLANNED | | Cement: | Sacks: 275, Top: 4200 ft., Bottom: 5793 ft. | | Casing: | String Type: 2ND, Hole Size: 5.5 in., Size: 4.5 in., Top: 0 ft., Depth: 5790 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 150, Top: 0 ft., Bottom: 5790 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/22/1954 | | Spud Date: | 8/1/1954 | Spud Date Is: | ACTUAL | | Measured TD: | 5800 ft. | Measured PB depth: | 5770 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 100 ft., Weight: 28 , Citings Type: ACTUAL | | Cement: | Sacks: 75, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5794 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 5285 ft., Bottom: 5770 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 5 in., Size: 4.5 in., Top: 0 ft., Depth: 5770 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 145, Top: 0 ft., Bottom: 5770 ft., Determination Method: VISU | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 4775 ft. | | | | | FORT HAYS | 5191 ft. | | | | | CARLILE | 5241 ft. | | | | | BENTONITE | 5547 ft. | | | | | D SAND | 5642 ft. | | | | | J SAND | 5716 ft. | | | |
Formation JSND Formation Classification: ERIW Status: IJ - 12/1/2022 Interval Top: 5717 ft. Interval Bottom: 5745 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/1/2018 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 11/6/2018 | Treatment End Date: | 11/6/2018 | | Treatment Summary: | Pumped 50 bbls acid (1575 gal 10% HCL, and 525 gal 15% Acetic with 100 balls), broke @ 3600 psi
Pumped 31 bbls water flush
No flow back fluid - followed acid job with injection water.
Current status - Injecting - J-Sand | | Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 3600 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 50 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 31 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | | | Treatment Date: | 7/10/2018 | Treatment End Date: | N/A | | Treatment Summary: | No treatment at this time. PCR will test injectivity before deciding if treatment is necessary and if necessary what type of treatment. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.666667 in. | Tubing Setting Depth: | 5684 ft. | | Tubing Packer Depth: | 5684 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 5717 ft. | # Of Holes: | 138 | | Interval Bottom: | 5745 ft. | Hole Size: | 0.42 in. |
|
Formation DSND Formation Classification: ERIW Status: AB - 11/19/2019 Interval Top: 5655 ft. Interval Bottom: 5661 ft.| Completed Information for Formation D SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | D SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/15/1957 | | Treatment Summary: | NATURAL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 22 | | BBLS_OIL | 3 |
| | Perforation Data: | | Interval Top: | 5655 ft. | # Of Holes: | 24 | | Interval Bottom: | 5661 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (UIC) | Y | Last Use 07/31/2024 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|