|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: ERIW Status: PA - 4/19/2001 Measured TD: 5740 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: ERIW PA - 4/19/2001 | | Wellbore Permit | | | Permit #: | 19540000 | Expiration Date: | 6/19/1954 | | Proposed Depth/Form: | 5750 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | ADENA J SAND UNIT | Unit Number: | | | Formation And Spacing: | Code: DJSND , Formation: D & J SAND , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 3/23/1954 | | Spud Date: | 2/25/1954 | Spud Date Is: | ACTUAL | | Measured TD: | 5740 ft. | Measured PB depth: | 5698 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | ELECTRICAL & MICRO | | Casing: | String Type: SURF, Hole Size: , Size: 8.625 in., Top: , Depth: 103 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 103 ft., Weight: 24 , Citings Type: HISTORICAL | | Cement: | Sacks: 65, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: , Size: 5.5 in., Top: , Depth: 5695 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: 3908 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: , Size: 5.5 in., Top: 0 ft., Depth: 5733 ft., Weight: 15.5 , Citings Type: HISTORICAL | | Cement: | Sacks: 275, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 4708 ft. | | N | | | CARLILE | 5180 ft. | | N | | | D SAND | 5584 ft. | | N | | | J SAND | 5647 ft. | | Y | |
Formation JSND Formation Classification: OW Status: AB - 4/19/2001 Interval Top: 5649 ft. Interval Bottom: 5670 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/23/1954 | Choke Size: | 0.000 in. | | Formation Name: | J SAND | Commingled: | No | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Tubing Size: | 2.5 in. | Tubing Setting Depth: | 5666 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/23/1954 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 34 | | CALC_GOR | 824 | | GRAVITY_OIL | 43 |
| | Perforation Data: | | Interval Top: | 5649 ft. | # Of Holes: | 116 | | Interval Bottom: | 5670 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/19/2001 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|