Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 This operator is no longer active in the State of Colorado.
 Surface Location
 API# 05-083-05353
Well Classification: ERIW Status: IJ - 6/10/2014
Well Name/No:CACHE UNIT #7 (OWP)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:MONUMENT GLOBAL RESOURCES INC - 10430
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C-02763
Facility Status:IJStatus Date6/10/2014
FacilityID:223880LocationID:313445
County:MONTEZUMA #083Location:SESW 35 35N20W N
Field:CACHE - #9610Elevation:4906 ft.
Basin:PARADOX BASIN  
Planned Location:600FSL  2040 FWLLat/Long: 37.241989 / -109.020183Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 37.241989 / -109.020183Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 6/10/2014             Measured TD: 5793 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 6/10/2014
Wellbore Permit
Permit #:19640600 Expiration Date:1/4/1966
Proposed Depth/Form:6000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DSCR , Formation: DESERT CREEK , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: ISMY , Formation: ISMAY , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/6/1986
Spud Date:11/29/1964Spud Date Is:ACTUAL
Measured TD:5793 ft.Measured PB depth:5665 ft.
True Vertical TD:True Vertical PB depth:
Log Types:SONIC GAMMA RAY-INDUCTION ELECTRICAL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 1512 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 1512 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 5790 ft., Weight: 14 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 3764 ft., Bottom: 5790 ft., Determination Method: CALC
Casing:String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 3110 ft., Weight: 14 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 72 ft., Bottom: 3110 ft., Determination Method: CALC

Formation ISMY                     Formation Classification:  GW                     Status:  IJ - 6/10/2014                 Interval Top: 5432 ft.    Interval Bottom: 5562 ft.

 Completed Information for Formation ISMAY
1st Production Date:12/24/1964Choke Size:0.750 in.
Formation Name:ISMAYCommingled:
Production Method:INJECTION
Open Hole Completion:
Formation Treatment
Treatment Date:1/6/1986
Treatment Summary:1/86 (REPAIR): SEE DOC #00620143. 3/68 (CONVERSION TO WATER INJECTION): SEE DOC #00620145. 12/64 (ORIGINAL COMPLETION): SEE DOC #00620164
Tubing Size:2.375 in.Tubing Setting Depth:5343 ft.
Tubing Packer Depth:5307 ft.Tubing Multiple Packer:N ft.
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/24/1964Test Method:FLOWING
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 17
CASING_PRESS 0
TUBING_PRESS 200
Perforation Data:
Interval Top:5432 ft.# Of Holes:384
Interval Bottom:5562 ft.Hole Size:0.5 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (UIC)YDefined Inactive
07/31/2014
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No