Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-081-06081
Well Classification: OW Status: PA - 6/12/2020
Well Name/No:GOV'T-STROOCK-NCT-1 #3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WESCO OPERATING INC - 95520
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:37808
Facility Status:PAStatus Date6/12/2020
FacilityID:222721LocationID:312882
County:MOFFAT #081Location:NESE 35 4N95W 6
Field:MAUDLIN GULCH - #52950Elevation:7902 ft.
Basin:PICEANCE BASIN  
Planned Location:1690FSL  720 FELLat/Long: 40.270218 / -108.011941Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.270240 / -108.011680Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 6/12/2020             Measured TD: 8506 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 6/12/2020
Wellbore Permit
Permit #:690190 Expiration Date:8/1/1995
Proposed Depth/Form:
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:C-0104704
Formation And Spacing:Code: PSPR , Formation: PHOSPHORIA , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:11/11/1911
Spud Date:5/2/1969Spud Date Is:ACTUAL
Measured TD:8506 ft.Measured PB depth:8249 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 1004 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 440, Top: 0 ft., Bottom: 1004 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 6814 ft., Weight: 20-26 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 4920 ft., Bottom: 6814 ft., Determination Method: CALC
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: , Top: 5964 ft., Depth: 8487 ft., Weight: 15 , Citings Type: ACTUAL
Cement:Sacks: 95, Top: 5964 ft., Bottom: 8487 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
FRONTIER5866 ft.
DAKOTA6180 ft.
CEDAR MOUNTAIN6250 ft.
MORRISON6312 ft.
CURTIS6768 ft.
SUNDANCE6805 ft.
ENTRADA6819 ft.
CHINLE7259 ft.
SHINARUMP7508 ft.
MOENKOPI7593 ft.
PHOSPHORIA8076 ft.
WEBER8259 ft.

Formation WEBR                     Formation Classification:  OW                     Status:  AB - 8/25/1987                 Interval Top: 8260 ft.    Interval Bottom: 8469 ft.

 Completed Information for Formation WEBER
1st Production Date:4/13/1983Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/13/1983
Treatment Summary:Perf Weber 8365', 8371', 8375', acidize w/ 500 gal 15% HCl. Swab 99% oil. Pull RBP, set RBP @ 8343', pkr @ 8280'. Perf Weber 8295', 8303', 8308', 8315', 8320', acidize w/ 500 gal 15% HCl. Swab 65% oil.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/13/1983Test Method:pumping
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 246
BBLS_OIL 1023
CALC_BBLS_H2O 246
CALC_BBLS_OIL 1023
GRAVITY_OIL 36
Perforation Data:
Interval Top:8260 ft.# Of Holes:8
Interval Bottom:8469 ft.Hole Size:

Formation PSPR                     Formation Classification:  OW                     Status:  AB - 3/3/1991                  Interval Top: 8090 ft.    Interval Bottom: 8234 ft.

 Completed Information for Formation PHOSPHORIA
1st Production Date:8/25/1987Choke Size: 
Formation Name:PHOSPHORIACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/25/1987
Treatment Summary:Perf Phosphoria 8090', 8106', 8123', 8146', 8163', 8174', 8188', 8214', 8234'. Frac w/ 1316 bbls gel & 81,000# 20/40 sand
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/25/1987Test Method:pumping
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 68
BBLS_OIL 396
CALC_BBLS_H2O 68
CALC_BBLS_OIL 396
GRAVITY_OIL 36
Perforation Data:
Interval Top:8090 ft.# Of Holes:9
Interval Bottom:8234 ft.Hole Size:

Formation MNKP                     Formation Classification:  OW                     Status:  AB - 1/28/1995                 Interval Top: 7778 ft.    Interval Bottom: 7922 ft.

 Completed Information for Formation MOENKOPI
1st Production Date:3/19/1991Choke Size: 
Formation Name:MOENKOPICommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/21/1991Test Method:pumping
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 555
CALC_BBLS_OIL 555
GRAVITY_OIL 36
Perforation Data:
Interval Top:7778 ft.# Of Holes:18
Interval Bottom:7922 ft.Hole Size:

Formation SRMP                     Formation Classification:  OW                     Status:  AB - 6/12/2020                 Interval Top: 7555 ft.    Interval Bottom: 7592 ft.

 Completed Information for Formation SHINARUMP
1st Production Date:2/6/1995Choke Size: 
Formation Name:SHINARUMPCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/6/1995
Treatment Summary:Perf Shinarump 7555'-92' w/ 2spf. Frac w/ 15,980 gal gel & 47,300# 20/40 sand
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/6/1995Test Method:pumping
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 44
BBLS_OIL 561
CALC_BBLS_H2O 44
CALC_BBLS_OIL 561
GRAVITY_OIL 36
Perforation Data:
Interval Top:7555 ft.# Of Holes:74
Interval Bottom:7592 ft.Hole Size:

Formation SNDC                     Formation Classification:  OW                     Status:  AB - 8/16/1977                 Interval Top: 6814 ft.    Interval Bottom: 6819 ft.

 Completed Information for Formation SUNDANCE
1st Production Date:6/8/1969Choke Size: 
Formation Name:SUNDANCECommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:8/16/1977
Treatment Summary:Completed Open Hole
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/8/1969Test Method:pumping
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 389
CALC_BBLS_H2O 12
CALC_BBLS_OIL 389
GRAVITY_OIL 36
Perforation Data:
Interval Top:6814 ft.# Of Holes:
Interval Bottom:6819 ft.Hole Size:

Formation DKTA                     Formation Classification:  OW                     Status:  AB - 3/12/1983                 Interval Top: 6190 ft.    Interval Bottom: 6234 ft.

 Completed Information for Formation DAKOTA
1st Production Date:9/16/1977Choke Size: 
Formation Name:DAKOTACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/16/1977
Treatment Summary:Acidize with 1500 gallons 15% HCL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/18/1977Test Method:pumping
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 595
BBLS_OIL 147
CALC_BBLS_H2O 595
CALC_BBLS_OIL 147
GRAVITY_OIL 36
Perforation Data:
Interval Top:6190 ft.# Of Holes:72
Interval Bottom:6234 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/12/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No