|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 7/21/2012 Measured TD: 15301 ft. Vertical TD: 10697 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 7/21/2012 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 7/22/2013 | | Proposed Depth/Form: | 12104 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | Kirkendall Flat | Unit Number: | COC-74790X | | Formation And Spacing: | Code: MNCS , Formation: MANCOS , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 118, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 1500 ft., Weight: 40.5 , Citings Type: PLANNED | | Cement: | Sacks: 818, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 8000 ft., Weight: 26.4 , Citings Type: PLANNED | | Cement: | Sacks: 848, Top: 3302 ft., Bottom: 8000 ft. | | Casing: | String Type: OPEN HOLE, Hole Size: 6.75 in., Size: , Top: , Depth: 12104 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 1/19/2012 | | Spud Date: | 11/18/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 15301 ft. | Measured PB depth: | 15270 ft. | | True Vertical TD: | 10697 ft. | True Vertical PB depth: | 10666 ft. | | Top PZ Location: | Sec:35 Twp: 9S 94W | Footage: 1337 FNL 2166 FWL | | Bottom Hole Location: | Sec:2 Twp: 9S 94W | Footage: 918 FNL 2010 FWL | | Log Types: | RST, CBL, PEX and Mud. | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 72 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 40, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 1543 ft., Weight: 40.5 , Citings Type: ACTUAL | | Cement: | Sacks: 833, Top: 0 ft., Bottom: 1557 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 9274 ft., Weight: 26.4 , Citings Type: ACTUAL | | Cement: | Sacks: 1112, Top: 2560 ft., Bottom: 9274 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.75 in., Size: 5 in., Top: 0 ft., Depth: 15279 ft., Weight: 23.2 , Citings Type: ACTUAL | | Cement: | Sacks: 450, Top: 7130 ft., Bottom: 15301 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 4215 ft. | 6975 ft. | N | N | | ILES | 6976 ft. | 8365 ft. | N | N | | MANCOS | 8366 ft. | 10630 ft. | N | N | | NIOBRARA | 10631 ft. | 15301 ft. | | |
Formation NBRR Formation Classification: GW Status: PR - 7/21/2012 Interval Top: 10640 ft. Interval Bottom: 15200 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/14/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/22/2012 | | Treatment Summary: | Stages 1-19 treated with a total of: 17,090 bbls of Slickwater, 1,004,270 lbs 100 Sand, 1,507,840 lbs 40-70 Sand. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/21/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 372 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 372 | | CALC_MCF_GAS | 10628 | | CASING_PRESS | 4750 | | MCF_GAS | 10628 |
| | Perforation Data: | | Interval Top: | 10640 ft. | # Of Holes: | 1632 | | Interval Bottom: | 15200 ft. | Hole Size: | 0.34 in. |
|
Formation MNCS Formation Classification: GW Status: PR - 7/21/2012 Interval Top: 8370 ft. Interval Bottom: 10558 ft.| Completed Information for Formation MANCOS | | 1st Production Date: | 7/14/2012 | Choke Size: | | | Formation Name: | MANCOS | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/22/2012 | | Treatment Summary: | States 20-28 treated with a total of: 154,081 bbls of Slickwater, 903,520 lbs 100 Sand, 1,330,430 lbs 40-70 Sand. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/21/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 372 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 372 | | CALC_MCF_GAS | 10628 | | CASING_PRESS | 4750 | | MCF_GAS | 10628 |
| | Perforation Data: | | Interval Top: | 8370 ft. | # Of Holes: | 588 | | Interval Bottom: | 10558 ft. | Hole Size: | 0.34 in. |
|
Sidetrack #01 Wellbore Classification: Status: AB - 8/8/2011 Measured TD: | Wellbore Data for Sidetrack #01 | Wellbore Classification: AB - 8/8/2011 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 7/23/2013 | | Proposed Top PZ Location: | Sec:35 Twp: 9S 94W | Footage: 1325 FNL 2172 FWL | | Bottom Hole Location: | Sec:2 Twp: 10S 94W | Footage: 2220 FNL 2302 FWL | | Proposed Depth/Form: | 16212 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | Kirkendall Flat | Unit Number: | COC-74790X | | Formation And Spacing: | Code: MNCS , Formation: MANCOS , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 118, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 1500 ft., Weight: 40.5 , Citings Type: PLANNED | | Cement: | Sacks: 818, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 8000 ft., Weight: 26.4 , Citings Type: PLANNED | | Cement: | Sacks: 848, Top: 3302 ft., Bottom: 8000 ft. | | Casing: | String Type: 2ND, Hole Size: 6.75 in., Size: 5 in., Top: 0 ft., Depth: 16212 ft., Weight: 23.2 , Citings Type: PLANNED | | Cement: | Sacks: 894, Top: 4066 ft., Bottom: 16212 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 11/18/2011 | Spud Date Is: | ACTUAL | | Measured TD: | | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | No formation data to display. |
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 47 |
| Total Gas Produced (MCF) | 181176 |
| GOR | 3854808 |
| GOR Determination | MCFE |
| Average BOE per Day | 85.685 |
| Average MCFE per Day | 496.977 |
| Federal Financial Assurance | i | Y |
|
|