Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-077-10085
Well Classification: GW Status: PR - 9/12/2014
Well Name/No:NVEGA FED 12B #6-14D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:LARAMIE ENERGY LLC - 10433
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 64765
Facility Status:PRStatus Date9/12/2014
FacilityID:417028LocationID:312666
County:MESA #077Location:NENW 12 9S93W 6
Field:BUZZARD CREEK - #9500Elevation:7533 ft.
Basin:PICEANCE BASIN  
Planned Location:1100FNL  2499 FWLLat/Long: 39.295089 / -107.719350Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.295086 / -107.719348Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/15/2012
End Date: 11/15/2012
Reported: 2/12/2013
Days to report: 89
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 3/15/2010             Measured TD: 5357 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 3/15/2010
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/3/2012
Proposed Top PZ Location:Sec:6 Twp: 9S 92W Footage: 260 FSL  250 FWL
Bottom Hole Location:Sec:6 Twp: 9S 92W Footage: 260 FSL  250 FWL
Proposed Depth/Form:8555 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit:Buzzard Creek Unit Number:47597A
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: 429-11 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: , Depth: 60 ft., Weight: 55 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 2200 ft., Weight: 24, 32 , Citings Type: PLANNED
Cement:Sacks: 740, Top: 0 ft., Bottom: 2200 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8176 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 477, Top: 5398 ft., Bottom: 8176 ft.

Wellbore Completed
Completion Date:8/15/2011
Spud Date:5/24/2011Spud Date Is:ACTUAL
Measured TD:5357 ft.Measured PB depth:3754 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec:6 Twp: 9S 92WFootage: 260 FSL  250 FWL
Bottom Hole Location:Sec:12 Twp: 9S 93WFootage: 693 FSL  890 FWL
Log Types:Note: See Form 5 for 05-077-10085 02 was submitted with required detail and attachments; well was drilled, not completed and is Temporarily Abandoned status. Well bore diagrams were also submitted for ST #1 and ST #2.
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 10, Top: 0 ft., Bottom: 90 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 2312 ft., Weight: 61 , Citings Type: ACTUAL
Cement:Sacks: 2020, Top: 0 ft., Bottom: 2312 ft., Determination Method: CALC
  No formation data to display.

Sidetrack #01             Wellbore Classification: GW             Status: AB - 7/22/2011             Measured TD: 5400 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: GW        AB - 7/22/2011
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/30/2013
Proposed Top PZ Location:Sec:6 Twp: 9S 92W Footage: 260 FSL  250 FWL
Bottom Hole Location:Sec:6 Twp: 9S 92W Footage: 260 FSL  250 FWL
Proposed Depth/Form:8176 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: 429-11 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 150, Top: 0 ft., Bottom: 90 ft.
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 2312 ft., Weight: 61 , Citings Type: PLANNED
Cement:Sacks: 2020, Top: 0 ft., Bottom: 2312 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8176 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 477, Top: 5398 ft., Bottom: 8176 ft.

Wellbore Completed
Completion Date:8/15/2011
Spud Date:5/24/2011Spud Date Is:ACTUAL
Measured TD:5400 ft.Measured PB depth:4315 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec:6 Twp: 9S 92WFootage: 260 FSL  250 FWL
Bottom Hole Location:Sec:6 Twp: 9S 92WFootage: 260 FSL  250 FWL
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 10, Top: 0 ft., Bottom: 90 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 2312 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 2020, Top: 0 ft., Bottom: 2312 ft., Determination Method: CALC
  No formation data to display.

Sidetrack #02             Wellbore Classification: GW             Status: PR - 9/12/2014             Measured TD: 9850 ft.    Vertical TD: 9345 ft.

 Wellbore Data for Sidetrack #02Wellbore Classification: GW        PR - 9/12/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/27/2013
Proposed Top PZ Location:Sec:6 Twp: 9S 92W Footage: 613 FSL  439 FWL
Bottom Hole Location:Sec:6 Twp: 9S 93W Footage: 573 FSL  989 FWL
Proposed Depth/Form:13516 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: 429-11 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 90 ft.
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 2312 ft., Weight: 61 , Citings Type: PLANNED
Cement:Sacks: 2020, Top: 0 ft., Bottom: 2312 ft.
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 9000 ft., Weight: 47 , Citings Type: PLANNED
Cement:Sacks: 1295, Top: 1800 ft., Bottom: 9000 ft.
Casing:String Type: 2ND, Hole Size: 8.5 in., Size: 5 in., Top: 0 ft., Depth: 13516 ft., Weight: 23.2 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 9500 ft., Bottom: 13516 ft.

Wellbore Completed
Completion Date:8/15/2011
Spud Date:5/24/2011Spud Date Is:ACTUAL
Measured TD:9850 ft.Measured PB depth:8439 ft.
True Vertical TD:9345 ft.True Vertical PB depth:7938 ft.
Top PZ Location:Sec:6 Twp: 9S 92WFootage: 613 FSL  439 FWL
Bottom Hole Location:Sec:6 Twp: 9S 93WFootage: 573 FSL  989 FWL
Log Types:PEX, CBL
Log Types:PEX, CBL
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 10, Top: 0 ft., Bottom: 90 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 2312 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 2020, Top: 0 ft., Bottom: 2312 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 9003 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1780, Top: 4850 ft., Bottom: 9003 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.25 in., Size: 4.5 in., Top: 0 ft., Depth: 8484 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1015, Top: 2600 ft., Bottom: 8484 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
OHIO CREEK5190 ft.
WILLIAMS FORK5650 ft.
CAMEO COAL7486 ft.
ROLLINS8436 ft.
COZZETTE8975 ft.
CORCORAN9134 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/3/2012                 Interval Top: 7060 ft.    Interval Bottom: 8363 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/23/2012Choke Size:20.000 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/15/2012Treatment End Date:11/16/2012
Treatment Summary:7,000 GALS 15% HCL 3,085,242 GALS. SLICKWATER; 1,476,215 # 30/50 WHITE SAND.
Total fluid used in treatment (bbls):73458Max pressure during treatment (psi):74432
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):167Min frac gradient (psi/ft):0.67
Recycled water used in treatment (bbls):3812Total flowback volume recovered (bbls):43759
Fresh water used in treatment (bbls):69646Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1476215Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/3/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 624
BTU_GAS 1036
CALC_BBLS_H2O 624
CALC_MCF_GAS 1173
CASING_PRESS 2370
MCF_GAS 1173
TUBING_PRESS 1420
Perforation Data:
Interval Top:7060 ft.# Of Holes:190
Interval Bottom:8363 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)46786
GOR
GOR DeterminationMCFE
Average BOE per Day22.098
Average MCFE per Day128.160

 Federal Financial Assurance  i Y

 Tribal Well  i No