Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-077-09623
Well Classification: GW Status: PR - 3/1/2010
Well Name/No:HAWKINS RANCH #10-3B
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:LARAMIE ENERGY LLC - 10433
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2010
FacilityID:295764LocationID:334520
County:MESA #077Location:NWNW 10 10S94W 6
Field:PLATEAU - #69300Elevation:7203 ft.
Basin:PICEANCE BASIN  
Planned Location:548FNL  907 FWLLat/Long: 39.210954 / -107.874132Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.210859 / -107.874180Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2010             Measured TD: 7261 ft.    Vertical TD: 7095 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2010
Wellbore PermitDIRECTIONAL
Permit #:20081419 Expiration Date:4/24/2009
Proposed Top PZ Location:Sec:10 Twp: 10S 94W Footage: 1020 FNL  1992 FEL
Bottom Hole Location:Sec:10 Twp: 10S 94W Footage: 1020 FNL  1992 FEL
Proposed Depth/Form:6536 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: 166-25 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/14/2008
Spud Date:11/3/2008Spud Date Is:ACTUAL
Measured TD:7261 ft.Measured PB depth:7205 ft.
True Vertical TD:7095 ft.True Vertical PB depth:7039 ft.
Top PZ Location:Sec:10 Twp: 10S 94WFootage: 1020 FNL  1992 FEL
Bottom Hole Location:Sec:10 Twp: 10S 94WFootage: 1020 FNL  1992 FEL
Log Types:ACOUSTIC CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1527 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 0 ft., Bottom: 1527 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7261 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 974, Top: 360 ft., Bottom: 7260 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK3765 ft.NN
CAMEO5997 ft.NN
ROLLINS6387 ft.NN
COZZETTE6793 ft.NN
CORCORAN6979 ft.NN

Formation CRCRN                   Formation Classification:  GW                   Status:  PR - 3/1/2010                  Interval Top: 6993 ft.    Interval Bottom: 6994 ft.

 Completed Information for Formation CORCORAN
1st Production Date:2/28/2010Choke Size:0.375 in.
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/5/2010
Treatment Summary:1 STAGE SLICWATER FRAC WITH 431 BBLS 2% KCI AND 16485 LBS 20/40 WHITE SAND. THIS STAGE WAS A COMBINED STAGE WITH THE COZZETTE FORMATION.
Tubing Size:2.375 in.Tubing Setting Depth:6414 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/1/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 25
BTU_GAS 1070
CALC_BBLS_H2O 25
CALC_MCF_GAS 149
CASING_PRESS 725
MCF_GAS 149
TUBING_PRESS 350
Perforation Data:
Interval Top:6993 ft.# Of Holes:3
Interval Bottom:6994 ft.Hole Size:0.35 in.

Formation COZZ                     Formation Classification:  GW                     Status:  PR - 3/1/2010                  Interval Top: 6830 ft.    Interval Bottom: 6900 ft.

 Completed Information for Formation COZZETTE
1st Production Date:2/28/2010Choke Size:0.375 in.
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/5/2010
Treatment Summary:1 STAGE OF SLICKWATER FRAC WITH 2641 BBLS 2% KCI AND 101263 LBS 20/40 WHITE SAND. THIS STAGE WAS A COMBINED STAGE WITH THE CORCORAN FORMATION.
Tubing Size:2.375 in.Tubing Setting Depth:6414 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/1/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 25
BTU_GAS 1070
CALC_BBLS_H2O 25
CALC_MCF_GAS 149
CASING_PRESS 725
MCF_GAS 149
TUBING_PRESS 350
Perforation Data:
Interval Top:6830 ft.# Of Holes:18
Interval Bottom:6900 ft.Hole Size:0.35 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/1/2013                  Interval Top: 5316 ft.    Interval Bottom: 6352 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/28/2010Choke Size:0.375 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/7/2010
Treatment Summary:3 STAGES OF SLICKWATER FRAC WITH 10092 BBLS 2% KCI AND 403237 LBS 20/40 WHITE SAND.
Tubing Size:2.375 in.Tubing Setting Depth:6414 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/1/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 75
BTU_GAS 1070
CALC_BBLS_H2O 75
CALC_MCF_GAS 448
CASING_PRESS 725
MCF_GAS 448
TUBING_PRESS 350
Perforation Data:
Interval Top:5316 ft.# Of Holes:78
Interval Bottom:6352 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)44
Total Gas Produced (MCF)15971
GOR362977
GOR DeterminationMCFE
Average BOE per Day7.670
Average MCFE per Day44.485

 Federal Financial Assurance  i 

 Tribal Well  i No