Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-077-09620
Well Classification: GW Status: PR - 12/18/2009
Well Name/No:HAWKINS RANCH #10-2A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:LARAMIE ENERGY LLC - 10433
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/18/2009
FacilityID:295767LocationID:334520
County:MESA #077Location:NWNW 10 10S94W 6
Field:PLATEAU - #69300Elevation:7203 ft.
Basin:PICEANCE BASIN  
Planned Location:540FNL  1016 FWLLat/Long: 39.210962 / -107.873744Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.210867 / -107.873862Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/18/2009             Measured TD: 7025 ft.    Vertical TD: 6451 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/18/2009
Wellbore PermitDIRECTIONAL
Permit #:20081423 Expiration Date:4/24/2009
Proposed Top PZ Location:Sec:10 Twp: 10S 94W Footage: 304 FNL  1941 FEL
Bottom Hole Location:Sec:10 Twp: 10S 94W Footage: 304 FNL  1941 FEL
Proposed Depth/Form:6995 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: 166-25 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/22/2008
Spud Date:8/10/2008Spud Date Is:ACTUAL
Measured TD:7025 ft.Measured PB depth:6969 ft.
True Vertical TD:6451 ft.True Vertical PB depth:6395 ft.
Top PZ Location:Sec:10 Twp: 10S 94WFootage: 304 FNL  1941 FEL
Bottom Hole Location:Sec:10 Twp: 10S 94WFootage: 304 FNL  1941 FEL
Log Types:HIGH RES.IND., SPCTRL DENS.,DUAL SPACED NEUTRON
Log Types:CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1553 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 0 ft., Bottom: 1533 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7015 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 790, Top: 1120 ft., Bottom: 7015 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6000 ft.NN
CAMEO6515 ft.NN
ROLLINS6838 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/1/2011                  Interval Top: 5820 ft.    Interval Bottom: 6808 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/19/2009Choke Size:0.500 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/3/2009
Treatment Summary:3 STAGES OF SLICKWATER FRAC WITH 10301 BBLS OF 2% KCI AND 343006 LBS OF 20/40 WHITE SAND.
Tubing Size:2.375 in.Tubing Setting Depth:6541 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/18/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 185
BTU_GAS 1070
CALC_BBLS_H2O 185
CALC_MCF_GAS 192
CASING_PRESS 175
MCF_GAS 192
Perforation Data:
Interval Top:5820 ft.# Of Holes:84
Interval Bottom:6808 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)21188
GOR
GOR DeterminationMCFE
Average BOE per Day10.008
Average MCFE per Day58.050

 Federal Financial Assurance  i 

 Tribal Well  i No