|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: IJ - 9/2/2025 Measured TD: 3110 ft. Vertical TD: 3109 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW IJ - 9/2/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20073106 | Expiration Date: | 8/6/2008 | | Proposed Depth/Form: | 3500 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | ORCHARD UNIT | Unit Number: | COC 66496X | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 8/23/2007 | | Spud Date: | 8/17/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 3110 ft. | Measured PB depth: | | | True Vertical TD: | 3109 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 0 FL 0 FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | CBL, PEX - SIDEWALL CORE | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: 40 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 530 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 0 ft., Bottom: 530 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 3096 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 470, Top: 0 ft., Bottom: 3110 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 0 ft. | 1876 ft. | N | N | | WILLIAMS FORK | 1877 ft. | 3110 ft. | N | N |
Formation WMFK Formation Classification: DSPW Status: IJ - 9/2/2025 Interval Top: 2661 ft. Interval Bottom: 3019 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 12/2/2007 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/16/2007 | | Treatment Summary: | STAGE 1 TREATED W/TOTAL 282 BBLS 15% HCL W/BIO-BALLS, 238 BBL 25# LINER GEL DIVERTER AND 2000# COARSE ROCK SALT. ON 11/14/07, RAN SUCCESSFUL MIT. 12/2/07 STARTED INJECTING.12/5/07 SI AFTER INJ TOTAL/10,000 BBLS WTR. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1170 |
| | Perforation Data: | | Interval Top: | 2661 ft. | # Of Holes: | 296 | | Interval Bottom: | 3019 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | Y |
|
|