Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-077-09372
Well Classification: DSPW Status: IJ - 9/2/2025
Well Name/No:ORCHARD FEDERAL DISPOSAL #2 (C17OU)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 58675
Facility Status:IJStatus Date9/2/2025
FacilityID:291766LocationID:334068
County:MESA #077Location:NENW 17 8S96W 6
Field:WILDCAT - #99999Elevation:5359 ft.
Basin:PICEANCE BASIN  
Planned Location:368FNL  1669 FWLLat/Long: 39.355708 / -108.136097Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.355710 / -108.136090Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: IJ - 9/2/2025             Measured TD: 3110 ft.    Vertical TD: 3109 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        IJ - 9/2/2025
Wellbore PermitDIRECTIONAL
Permit #:20073106 Expiration Date:8/6/2008
Proposed Depth/Form:3500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:ORCHARD UNIT Unit Number:COC 66496X
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/23/2007
Spud Date:8/17/2007Spud Date Is:ACTUAL
Measured TD:3110 ft.Measured PB depth:
True Vertical TD:3109 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 0 FL  0 FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:CBL, PEX - SIDEWALL CORE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 530 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 270, Top: 0 ft., Bottom: 530 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 3096 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 470, Top: 0 ft., Bottom: 3110 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.1876 ft.NN
WILLIAMS FORK1877 ft.3110 ft.NN

Formation WMFK                     Formation Classification:  DSPW                     Status:  IJ - 9/2/2025                  Interval Top: 2661 ft.    Interval Bottom: 3019 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:12/2/2007Choke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/16/2007
Treatment Summary:STAGE 1 TREATED W/TOTAL 282 BBLS 15% HCL W/BIO-BALLS, 238 BBL 25# LINER GEL DIVERTER AND 2000# COARSE ROCK SALT. ON 11/14/07, RAN SUCCESSFUL MIT. 12/2/07 STARTED INJECTING.12/5/07 SI AFTER INJ TOTAL/10,000 BBLS WTR.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1170
Perforation Data:
Interval Top:2661 ft.# Of Holes:296
Interval Bottom:3019 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No