|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 6/10/2019 Measured TD: 6547 ft. Vertical TD: 6308 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 6/10/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20070205 | Expiration Date: | 2/19/2008 | | Proposed Top PZ Location: | Sec:14 Twp: 8S 96W | Footage: 646 FSL 2038 FEL | | Bottom Hole Location: | Sec:14 Twp: 8S 96W | Footage: 629 FSL 2042 FEL | | Proposed Depth/Form: | 6719 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | ORCHARD UNIT | Unit Number: | COC66496X | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 9/8/2007 | | Spud Date: | 8/27/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 6547 ft. | Measured PB depth: | 6072 ft. | | True Vertical TD: | 6308 ft. | True Vertical PB depth: | 5833 ft. | | Top PZ Location: | Sec:14 Twp: 8S 96W | Footage: 646 FSL 2038 FEL | | Bottom Hole Location: | Sec:14 Twp: 8S 96W | Footage: 629 FSL 2042 FEL | | Log Types: | PEX, CBL, RST/GR | | Log Types: | PEX, RST/GR/CCL, CBL/TEMP/GR/CCL | | Log Types: | PEX, RST, CBL | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 40 ft., Weight: 84 , Citings Type: ACTUAL | | Cement: | Sacks: 20, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1155 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 455, Top: 0 ft., Bottom: 1155 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 6536 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 960, Top: 3100 ft., Bottom: 6540 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 2851 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 2520 ft., Bottom: 2910 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 2520 ft., Depth: 2910 ft., Bottom: 2910 ft., Sacks: 100, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 0 ft. | 3304 ft. | | | | WILLIAMS FORK | 3305 ft. | 5781 ft. | | | | ROLLINS | 5782 ft. | 6064 ft. | | | | COZZETTE | 6065 ft. | 6251 ft. | | | | CORCORAN | 6252 ft. | 6547 ft. | | |
Formation COZZ Formation Classification: GW Status: AB - 11/30/2011 Interval Top: 6087 ft. Interval Bottom: 6114 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 11/3/2007 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/20/2011 | | Treatment Summary: | SET CBP TO TA WELL AND RUN MIT | | Formation Treatment | | Treatment Date: | 10/17/2007 | | Treatment Summary: | STAGE 2 TREATED W/2512 BBL SLICKWATER, 100,092 LBS 20-40 WHITE , AND 2000 LBS NON API SAND. SET CIBP AT 6230' ON 10/16/2007, THEN WENT DIRECTLY TO STAGE 2. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 107 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 285 | | CASING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 6087 ft. | # Of Holes: | 34 | | Interval Bottom: | 6114 ft. | Hole Size: | 0.34 in. |
|
Formation WMFK Formation Classification: GW Status: AB - 11/30/2011 Interval Top: 4466 ft. Interval Bottom: 5346 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 11/3/2007 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/20/2011 | | Treatment Summary: | SET CBP TO TA WELL AND RUN MIT | | Formation Treatment | | Treatment Date: | 10/17/2007 | | Treatment Summary: | STAGES 3-6 TREATED W/TOTAL 9703 BBLS OF SLICKWATER, 384,353 LBS 20-40 WHITE, AND 10,630 LBS NON API SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 427 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 1139 | | CASING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 4466 ft. | # Of Holes: | 74 | | Interval Bottom: | 5346 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/10/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|