Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-077-09054
Well Classification: GW Status: SI - 10/1/2025
Well Name/No:KEINATH FEDERAL #9-11 (K9OU)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C58674
Facility Status:SIStatus Date10/1/2025
FacilityID:284337LocationID:334063
County:MESA #077Location:NESW 9 8S96W 6
Field:GRAND VALLEY - #31290Elevation:5648 ft.
Basin:PICEANCE BASIN  
Planned Location:1976FSL  1976 FWLLat/Long: 39.362093 / -108.116071Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.362300 / -108.116350Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 10/1/2025             Measured TD: 10232 ft.    Vertical TD: 10229 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 10/1/2025
Wellbore PermitDRIFTED
Permit #:20071596 Expiration Date:4/16/2008
Proposed Depth/Form:5702 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MNCS , Formation: MANCOS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/11/2007
Spud Date:6/12/2007Spud Date Is:ACTUAL
Measured TD:10232 ft.Measured PB depth:10232 ft.
True Vertical TD:10229 ft.True Vertical PB depth:10229 ft.
Top PZ Location:Sec:9 Twp: 8S 96WFootage: 1910 FSL  1951 FWL
Bottom Hole Location:Sec:9 Twp: 8S 96WFootage: 1852 FSL  1877 FWL
Log Types:PEX, FMI, SWC
Log Types:PEX, FMI, SWC
Log Types:PEX, FMI, SWC
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 4, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1215 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 0 ft., Bottom: 1233 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 10227 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1296, Top: 4570 ft., Bottom: 10232 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: , Size: , Top: 0 ft., Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Casing:String Type: 3RD, Hole Size: , Size: , Top: 0 ft., Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Casing:String Type: 1ST LINER, Hole Size: , Size: , Top: 0 ft., Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: 1ST , Top: 4572 ft., Depth: 4723 ft., Bottom: , Sacks: 50, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 4572 ft., Depth: 4724 ft., Bottom: , Sacks: 100, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.2525 ft.
WILLIAMS FORK2526 ft.4914 ft.
ROLLINS4915 ft.5158 ft.
COZZETTE5387 ft.5577 ft.
CORCORAN5387 ft.5577 ft.
SEGO5578 ft.6200 ft.
CASTLEGATE6201 ft.8246 ft.
MANCOS6201 ft.8246 ft.
NIOBRARA8247 ft.9651 ft.
FRONTIER9652 ft.9833 ft.
DAKOTA9834 ft.9978 ft.
CEDAR MOUNTAIN9979 ft.10232 ft.

Formation CDMTN                   Formation Classification:  GW                   Status:  SI - 10/1/2015                 Interval Top: 10006 ft.    Interval Bottom: 10034 ft.

 Completed Information for Formation CEDAR MOUNTAIN
1st Production Date:N/AChoke Size: 
Formation Name:CEDAR MOUNTAINCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/21/2013Treatment End Date:5/21/2013
Treatment Summary:CIBP @ 8325' DRILLED OUT
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/1/2007
Treatment Summary:STAGE 1 TREATED WITH A TOTAL OF 3867 BBLS OF LIGHTENING 34 AND 130053 LBS 30/50 SAND
Formation Treatment
Treatment Date:9/22/2007
Treatment Summary:STAGES 001 TREATED WITH A TOTAL OF: 3867 BBLS LIGHTENING 34 AND 130053 LBS 30/50 SAND
Tubing Size:2.375 in.Tubing Setting Depth:6197 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 24
BTU_GAS 1170
CALC_BBLS_H2O 24
CALC_MCF_GAS 450
CASING_PRESS 500
MCF_GAS 450
Perforation Data:
Interval Top:10006 ft.# Of Holes:40
Interval Bottom:10034 ft.Hole Size:0.34 in.

Formation DKTA                     Formation Classification:  GW                     Status:  SI - 10/1/2015                 Interval Top: 9840 ft.    Interval Bottom: 9919 ft.

 Completed Information for Formation DAKOTA
1st Production Date:N/AChoke Size: 
Formation Name:DAKOTACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/21/2013Treatment End Date:5/21/2013
Treatment Summary:CIBP @ 8325' DRILLED OUT
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/1/2007
Treatment Summary:STAGE 2 TREATED WITH A TOTAL OF 4879 BBLS OF LIGHTENING 34 AND 170014 LBS 30/50 SAND
Formation Treatment
Treatment Date:9/22/2007
Treatment Summary:STAGES 002 TREATED WITH A TOTAL OF: 4879 BBLS LIGHTNING 34 AND 170014 LBS 30/50 SAND
Tubing Size:2.375 in.Tubing Setting Depth:6197 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 14
BTU_GAS 1170
CALC_BBLS_H2O 14
CALC_MCF_GAS 270
CASING_PRESS 500
MCF_GAS 270
Perforation Data:
Interval Top:9840 ft.# Of Holes:40
Interval Bottom:9919 ft.Hole Size:0.34 in.

Formation FRTR                     Formation Classification:  GW                     Status:  SI - 6/1/2009                  Interval Top: 9650 ft.    Interval Bottom: 9660 ft.

 Completed Information for Formation FRONTIER
1st Production Date:N/AChoke Size: 
Formation Name:FRONTIERCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:5/21/2013Treatment End Date:5/21/2013
Treatment Summary:CIBP @ 8325' DRILLED OUT
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/1/2007
Treatment Summary:STAGE 3 TREATED WITH A TOTAL OF: 2304 BBLS OF SLICKWEATER AND 59841 LBS 30/50 WHITE SAND.
Tubing Size:2.375 in.Tubing Setting Depth:6197 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 0
BTU_GAS 1170
CALC_BBLS_H2O 5
CALC_GOR 0
CALC_MCF_GAS 90
CASING_PRESS 500
GRAVITY_OIL 0
MCF_GAS 90
Perforation Data:
Interval Top:9650 ft.# Of Holes:20
Interval Bottom:9660 ft.Hole Size:0.34 in.

Formation NBRR                     Formation Classification:  GW                     Status:  SI - 6/1/2009                  Interval Top: 8376 ft.    Interval Bottom: 9251 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:5/21/2013Treatment End Date:5/21/2013
Treatment Summary:CIBP @ 8325' DRILLED OUT
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/1/2007
Treatment Summary:STAGES 4-10 TREATED WIHT A TOTAL OF 26773 BBLS OF SLCIKWATER AND 606301 LBS 30/50 WHITE SAND
Tubing Size:2.375 in.Tubing Setting Depth:6197 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 0
BTU_GAS 1170
CALC_BBLS_H2O 5
CALC_GOR 0
CALC_MCF_GAS 90
CASING_PRESS 500
GRAVITY_OIL 0
MCF_GAS 90
Perforation Data:
Interval Top:8376 ft.# Of Holes:188
Interval Bottom:9251 ft.Hole Size:0.34 in.

Formation MNCS                     Formation Classification:  GW                     Status:  SI - 10/1/2025                 Interval Top: 7009 ft.    Interval Bottom: 8242 ft.

 Completed Information for Formation MANCOS
1st Production Date:4/17/2009Choke Size: 
Formation Name:MANCOSCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:5/21/2013Treatment End Date:5/21/2013
Treatment Summary:CIBP @ 8325' DRILLED OUT
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/23/2009
Treatment Summary:STAGES 11-14 TREATED WITH A TOTAL OF: 42419 BBLS OF SLICKWATER, 219300 LBS 100 SAND, 492000 LBS 40-70 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:6197 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 4
BTU_GAS 1170
CALC_BBLS_H2O 4
CALC_MCF_GAS 1489
CASING_PRESS 1710
MCF_GAS 1489
TUBING_PRESS 1500
Perforation Data:
Interval Top:7009 ft.# Of Holes:180
Interval Bottom:8242 ft.Hole Size:0.27 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)44
GOR
GOR DeterminationMCFE
Average BOE per Day0.019
Average MCFE per Day0.118

 Federal Financial Assurance  i Y

 Tribal Well  i No