Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-077-09044
Well Classification: GW Status: PR - 7/1/2025
Well Name/No:KEINATH FEDERAL #8-5 (F8OU)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2025
FacilityID:284080LocationID:334106
County:MESA #077Location:SENW 8 8S96W 6
Field:GRAND VALLEY - #31290Elevation:5378 ft.
Basin:PICEANCE BASIN  
Planned Location:1767FNL  1962 FWLLat/Long: 39.366220 / -108.135140Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.366210 / -108.135150Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2025             Measured TD: 5619 ft.    Vertical TD: 5356 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20060628 Expiration Date:4/4/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1980 FNL  710 FWL
Bottom Hole Location:Sec:8 Twp: 8S 96W Footage: 1980 FNL  710 FWL
Proposed Depth/Form:5673 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit:ORCHARD UNIT Unit Number:COC66496X
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/14/2006
Spud Date:7/3/2006Spud Date Is:ACTUAL
Measured TD:5619 ft.Measured PB depth:5574 ft.
True Vertical TD:5356 ft.True Vertical PB depth:
Top PZ Location:Sec:8 Twp: 8S 96WFootage: 1969 FNL  729 FWL
Bottom Hole Location:Sec:8 Twp: 8S 96WFootage: 1969 FNL  729 FWL
Log Types:RST, CBL/GR/TEMP
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 140, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1529 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 705, Top: 0 ft., Bottom: 1531 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5619 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 1810 ft., Bottom: 5619 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.1997 ft.NN
MESAVERDE1998 ft.2355 ft.NN
WILLIAMS FORK2356 ft.4802 ft.NN
ROLLINS4803 ft.5057 ft.NN
COZZETTE5058 ft.5283 ft.NN
CORCORAN5284 ft.5471 ft.NN
SEGO5472 ft.NN

Formation SEGO                     Formation Classification:  GW                     Status:  PR - 7/1/2025                  Interval Top: 5472 ft.    Interval Bottom: 5502 ft.

 Completed Information for Formation SEGO
1st Production Date:8/7/2006Choke Size:24.000 in.
Formation Name:SEGOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/26/2006
Treatment Summary:STAGE 01 TREATED WITH A TOTAL OF : 1723 BBLS OF LIGHTNING 18, 168430 LBS 20-40 SAND.
Tubing Size:2.75 in.Tubing Setting Depth:4332 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/8/2006Test Method:FLOWING
Hours Tested:20Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BTU_GAS 1170
CALC_BBLS_H2O 2
CALC_MCF_GAS 10
CASING_PRESS 825
MCF_GAS 9
TUBING_PRESS 450
Perforation Data:
Interval Top:5472 ft.# Of Holes:18
Interval Bottom:5502 ft.Hole Size:0.34 in.

Formation CRCRN                   Formation Classification:  GW                   Status:  PR - 7/1/2025                  Interval Top: 5290 ft.    Interval Bottom: 5471 ft.

 Completed Information for Formation CORCORAN
1st Production Date:8/7/2006Choke Size:24.000 in.
Formation Name:CORCORANCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/26/2006
Treatment Summary:STAGE 1 TOTAL BBLS LISTED BELOW.
Tubing Size:2.375 in.Tubing Setting Depth:4332 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/8/2006Test Method:FLOWING
Hours Tested:20Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 27
BTU_GAS 1170
CALC_BBLS_H2O 32
CALC_MCF_GAS 197
CASING_PRESS 825
MCF_GAS 164
TUBING_PRESS 450
Perforation Data:
Interval Top:5290 ft.# Of Holes:92
Interval Bottom:5471 ft.Hole Size:0.34 in.

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 7/1/2025                  Interval Top: 3797 ft.    Interval Bottom: 4464 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:8/7/2006Choke Size:24.000 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/31/2006
Treatment Summary:STAGES 02-03 TREATED WITH A TOTAL OF: 5598 BBLS OF SLICKWATER, 215384 LBS 20-40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:4332 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/8/2006Test Method:FLOWING
Hours Tested:20Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 112
BTU_GAS 1170
CALC_BBLS_H2O 134
CALC_MCF_GAS 828
CASING_PRESS 825
MCF_GAS 690
TUBING_PRESS 450
Perforation Data:
Interval Top:3797 ft.# Of Holes:40
Interval Bottom:4464 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)10031
GOR
GOR DeterminationMCFE
Average BOE per Day4.682
Average MCFE per Day27.161

 Federal Financial Assurance  i Y

 Tribal Well  i No