|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/1/2025 Measured TD: 5755 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/1/2025 | | Wellbore Permit | | | Permit #: | 20042095 | Expiration Date: | 9/27/2005 | | Proposed Depth/Form: | 6100 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/6/2004 | | Spud Date: | 10/9/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 5755 ft. | Measured PB depth: | 5662 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | HIGH RESOLUTION IND,SPECTAL; DEN.DUAL SPACED NEU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1052 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 440, Top: 0 ft., Bottom: 1052 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5662 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 910, Top: 1700 ft., Bottom: 5662 ft., Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 4448 ft. | 5675 ft. | N | N | | ROLLINS | 5675 ft. | 0 ft. | N | N |
Formation WMFK Formation Classification: GW Status: PR - 1/1/2025 Interval Top: 4454 ft. Interval Bottom: 5504 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/6/2004 | | Treatment Summary: | FRACED FORMATION TWICE IN 4 STAGES USING 3570 SX PROPONANT& 10,154 SX SAND IN 1ST FRAC AND 3207 SX PROPONANT&12,765 SX SAND IN 2ND FRAC.(SEE ATTACHMENT FOR DETAIL) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5500 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/4/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 24 | | BBLS_OIL | 0 | | BTU_GAS | 656 | | CALC_BBLS_H2O | 24 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 199 | | MCF_GAS | 199 |
| | Perforation Data: | | Interval Top: | 4454 ft. | # Of Holes: | 77 | | Interval Bottom: | 5504 ft. | Hole Size: | 3 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1 |
| Total Gas Produced (MCF) | 7192 |
| GOR | 7192000 |
| GOR Determination | MCFE |
| Average BOE per Day | 3.431 |
| Average MCFE per Day | 19.918 |
| Federal Financial Assurance | i | |
|
|