|
|
|
|
Wellbore #00 Wellbore Classification: STOW Status: IJ - 1/1/2015 Measured TD: 5766 ft. Wellbore Data for Original Wellbore | Wellbore Classification: STOW IJ - 1/1/2015 | Wellbore Permit | | Permit #: | | Expiration Date: | 1/4/2012 | Prop Depth/Form: | 5766 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 0, Drill Unit: | Formation And Spacing: | Code: OSND , Formation: O SAND , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: SURF, Hole Size: 13.625 in., Size: 9.625 in., Top: , Depth: 219 ft., Weight: 25.4 , Citings Type: PLANNED | Cement: | Sacks: 160, Top: 0 ft., Bottom: 219 ft. | Casing: | String Type: 1ST, Hole Size: 9.5 in., Size: 5.5 in., Top: , Depth: 5359 ft., Weight: 15.5 , Citings Type: PLANNED | Cement: | Sacks: 250, Top: 4778 ft., Bottom: 5269 ft. | Casing: | String Type: 2ND, Hole Size: 4.75 in., Size: 4.5 in., Top: , Depth: 5766 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 50, Top: 5219 ft., Bottom: 5766 ft. |
| | |
Wellbore Completed | Completion Date: | 1/31/1952 | Spud Date: | 1/6/1952 | Spud Date Is: | ACTUAL | Measured TD: | 5766 ft. | Measured PB depth: | 5765 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DIL, NEUTRON, SONIC, GR ON 11/10/2009 | Log Types: | | Casing: | String Type: SURF, Hole Size: 13.625 in., Size: 9.625 in., Top: 0 ft., Depth: 215 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 160, Top: 0 ft., Bottom: 215 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 9.5 in., Size: 5.5 in., Top: 0 ft., Depth: 5359 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 4778 ft., Bottom: 5359 ft., Determination Method: | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5359 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 190 ft., Bottom: 1200 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | Cement: | Sacks: 12, Top: 5159 ft., Bottom: 5165 ft., Determination Method: CBL | Casing: | String Type: 2ND, Hole Size: 5.5 in., Size: 3.5 in., Top: 0 ft., Depth: 5210 ft., Weight: 9.3 , Citings Type: ACTUAL | Cement: | Sacks: 256, Top: 0 ft., Bottom: 5210 ft., Determination Method: VISU | Casing: | String Type: 1ST LINER, Hole Size: 4.75 in., Size: 4.5 in., Top: 5210 ft., Depth: 5673 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 50, Top: 5219 ft., Bottom: 5673 ft., Determination Method: CBL | Casing: | String Type: TAPER, Hole Size: 4.5 in., Size: 2.875 in., Top: 5210 ft., Depth: 5597 ft., Weight: 6.5 , Citings Type: ACTUAL | Cement: | Sacks: 19, Top: 5210 ft., Bottom: 5572 ft., Determination Method: CALC | Casing: | String Type: S.C. 1.3, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | Cement: | Sacks: 40, Top: 5252 ft., Bottom: 5304 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | D SAND | 5143 ft. | | N | N | J SAND | 5252 ft. | | N | N | O SAND | 5660 ft. | | N | N |
Formation OSND Formation Classification: DSPW Status: IJ - 1/1/2015 Interval Top: 5660 ft. Interval Bottom: 5765 ft. Completed Information for Formation O SAND | 1st Production Date: | 5/26/2010 | Choke Size: | | Formation Name: | O SAND | Commingled: | | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Date: | 5/26/2010 | Treatment Summary: | WATER DISPOSAL COMPLETION: 05/26/2010 |
| Tubing Size: | 3.5 in. | Tubing Setting Depth: | 5210 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation OSND. |
| Perforation Data: | Interval Top: | 5660 ft. | # Of Holes: | | Interval Bottom: | 5765 ft. | Hole Size: | 0.4 in. |
|
Formation JSND Formation Classification: DSPW Status: AB - 11/6/2009 Interval Top: 5252 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/6/2009 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 83 | GRAVITY_OIL | 38 |
| Perforation Data: | Interval Top: | | # Of Holes: | | Interval Bottom: | | Hole Size: | |
|
Formation DSND Formation Classification: DSPW Status: AB - 11/6/2009 Interval Top: 5143 ft. Completed Information for Formation D SAND | 1st Production Date: | 2/27/2008 | Choke Size: | | Formation Name: | D SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/6/2009 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DSND. |
| Perforation Data: | Interval Top: | | # Of Holes: | | Interval Bottom: | | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|