Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 This operator is no longer active in the State of Colorado.
 Surface Location
 API# 05-075-05875
Well Classification: ERIW Status: PA - 6/25/2018
Well Name/No:NW GRAYLIN (LOGAN J 12-2W) #2-W (OWP)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BENCHMARK ENERGY LLC - 10380
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/25/2018
FacilityID:219053LocationID:312151
County:LOGAN #075Location:NWNE 13 8N54W 6
Field:GRAYLIN NW - #31880Elevation:4199 ft.
Planned Location:330FNL  1649 FELLat/Long: 40.666518 / -103.359369Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.666365 / -103.359354Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: PA - 6/25/2018             Measured TD: 5081 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        PA - 6/25/2018
Wellbore Permit
Permit #:19540000 Expiration Date:4/6/1954
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit:NW GRAYLIN, LOGAN J Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/19/1954
Spud Date:12/11/1954Spud Date Is:ACTUAL
Measured TD:5081 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:ELECTRICAL
Casing:String Type: SURF, Hole Size: 10 in., Size: 9.625 in., Top: , Depth: 217 ft., Weight: 25.9 , Citings Type: ACTUAL
Cement:Sacks: 160, Top: , Bottom: 160 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 10 in., Size: 5.5 in., Top: , Depth: 5078 ft., Weight: 14 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 4460 ft., Bottom: 5078 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
D SAND4899 ft.
J SAND5006 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 6/25/2018                 Interval Top: 5008 ft.    Interval Bottom: 5029 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:
Production Method:INJECTION
Open Hole Completion:
Formation Treatment
Treatment Date:12/19/1954
Treatment Summary:ACIDIZED W/250 GAL 15% MCA ACID
Tubing Size:2.375 in.Tubing Setting Depth:
Tubing Packer Depth:4964 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:5008 ft.# Of Holes:
Interval Bottom:5029 ft.Hole Size:

Formation DSND                     Formation Classification:  GW                     Status:  AB - 11/26/1969                Interval Top: 4899 ft.    Interval Bottom: 4906 ft.

 Completed Information for Formation D SAND
1st Production Date:N/AChoke Size: 
Formation Name:D SANDCommingled:
Production Method:INJECTION
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/4/1955Test Method:PUMPING
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 261
CASING_PRESS 20
GRAVITY_OIL 38
TUBING_PRESS 20
Perforation Data:
Interval Top:4899 ft.# Of Holes:
Interval Bottom:4906 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No