|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/1/2020 Measured TD: 8065 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/1/2020 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 3/29/2016 | | Proposed Depth/Form: | 8400 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: MSSP , Formation: MISSISSIPPIAN , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PENN , Formation: PENNSYLVANIAN , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 300 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 300 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8400 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 5500 ft., Bottom: 8400 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/7/2014 | | Spud Date: | 6/24/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 8065 ft. | Measured PB depth: | 7991 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | Compensated Density Compensated Neutron, High Resolution Induction, Radial Cement Bond Log, Ind-Dens-Neu, | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 323 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 165, Top: 0 ft., Bottom: 323 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8057 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 302, Top: 4700 ft., Bottom: 8057 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 2980 ft., Depth: 4810 ft., Bottom: 4810 ft., Sacks: 250, Method: STAGE TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 3197 ft. | | | | | CODELL | 3759 ft. | | | | | CEDAR HILLS | 5402 ft. | | | | | LANSING | 6703 ft. | | | | | TORCH | 7048 ft. | 7070 ft. | | Y | | PAWNEE B | 7096 ft. | 7121 ft. | | Y | | CHEROKEE | 7160 ft. | 7200 ft. | | Y | | OSAGE | 7396 ft. | 7945 ft. | | N |
Formation OSAGE Formation Classification: OW Status: AB - 8/18/2014 Interval Top: 7937 ft. Interval Bottom: 7945 ft.| Completed Information for Formation OSAGE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | OSAGE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 8/18/2014 | Treatment End Date: | N/A | | Treatment Summary: | 8-13-2014 No Treatment, Perf Osage 7937' - 7945' set packer @ 7887' SWAB all water
8-14-2014 Set CIBP @ 7920' with 2 sks cement
8-18-2014 CIBP @ 7920' leaking Set new CIBP @ 7290 with 2 sks cement plug and abandon Osage formation | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7887 ft. | | Tubing Packer Depth: | 7887 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/13/2014 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 22 | | CALC_BBLS_H2O | 66 |
| | Perforation Data: | | Interval Top: | 7937 ft. | # Of Holes: | 52 | | Interval Bottom: | 7945 ft. | Hole Size: | 0.25 in. |
|
Formation CHRK Formation Classification: OW Status: AB - 8/20/2014 Interval Top: 7170 ft. Interval Bottom: 7180 ft.| Completed Information for Formation CHEROKEE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CHEROKEE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 8/18/2014 | Treatment End Date: | 9/20/2014 | | Treatment Summary: | 8-14-2014 perf Cherokee A formation 7170' - 7180'
8-18-2014 acid job 24 bbls 15% HCL, 43 bbls 2% KCL load 41 bbls broke @ 1500 psi SWAB recover 81 bbls water
8-19-2014 acid job 63 bbls 15% HCL, 60 bbls 2% KCL SWAB recover 143 bbls water
8-20-2014 SWAB recover 89 bbls water. Set CIBP @ 7150' with 2 sks cement plug and abandon Cherokee A | | Total fluid used in treatment (bbls): | 190 | Max pressure during treatment (psi): | 1500 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 87 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 293 | | Fresh water used in treatment (bbls): | 103 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7105 ft. | | Tubing Packer Depth: | 7105 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/18/2014 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 27 | | CALC_BBLS_H2O | 81 |
| | Perforation Data: | | Interval Top: | 7170 ft. | # Of Holes: | 40 | | Interval Bottom: | 7180 ft. | Hole Size: | 0.25 in. |
|
Formation PAWNB Formation Classification: OW Status: PR - 7/1/2020 Interval Top: 7096 ft. Interval Bottom: 7108 ft.| Completed Information for Formation PAWNEE B | | 1st Production Date: | 8/28/2014 | Choke Size: | | | Formation Name: | PAWNEE B | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 8/21/2014 | Treatment End Date: | 8/22/2014 | | Treatment Summary: | 8-20-2014 perf Pawnee B 7096' - 7108'
8-21-2014 acid job 29 bbls 15% HCL, 42 bbls 2% KCL SWAB recover 69 bbls of oil and 105 bbls of water | | Total fluid used in treatment (bbls): | 71 | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 29 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 172 | | Fresh water used in treatment (bbls): | 42 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7040 ft. | | Tubing Packer Depth: | 7040 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/21/2014 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 35 | | BBLS_OIL | 23 | | CALC_BBLS_H2O | 105 | | CALC_BBLS_OIL | 69 | | GRAVITY_OIL | 35 |
| | Perforation Data: | | Interval Top: | 7096 ft. | # Of Holes: | 48 | | Interval Bottom: | 7108 ft. | Hole Size: | 0.25 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2733 |
| Total Gas Produced (MCF) | 2535 |
| GOR | 927 |
| GOR Determination | BOE |
| Average BOE per Day | 8.866 |
| Average MCFE per Day | 51.418 |
| Federal Financial Assurance | i | |
|
|