|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/1/2020 Measured TD: 8065 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/1/2020 | Wellbore Permit | | Permit #: | | Expiration Date: | 3/29/2016 | Proposed Depth/Form: | 8400 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: MSSP , Formation: MISSISSIPPIAN , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: PENN , Formation: PENNSYLVANIAN , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 300 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: 0 ft., Bottom: 300 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8400 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 300, Top: 5500 ft., Bottom: 8400 ft. |
| | |
Wellbore Completed | Completion Date: | 8/7/2014 | Spud Date: | 6/24/2014 | Spud Date Is: | ACTUAL | Measured TD: | 8065 ft. | Measured PB depth: | 7991 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | Compensated Density Compensated Neutron, High Resolution Induction, Radial Cement Bond Log, Ind-Dens-Neu, | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 323 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 165, Top: 0 ft., Bottom: 323 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8057 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 302, Top: 4700 ft., Bottom: 8057 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 2980 ft., Depth: 4810 ft., Bottom: 4810 ft., Sacks: 250, Method: STAGE TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 3197 ft. | | | | CODELL | 3759 ft. | | | | CEDAR HILLS | 5402 ft. | | | | LANSING | 6703 ft. | | | | TORCH | 7048 ft. | 7070 ft. | | Y | PAWNEE B | 7096 ft. | 7121 ft. | | Y | CHEROKEE | 7160 ft. | 7200 ft. | | Y | OSAGE | 7396 ft. | 7945 ft. | | N |
Formation OSAGE Formation Classification: OW Status: AB - 8/18/2014 Interval Top: 7937 ft. Interval Bottom: 7945 ft. Completed Information for Formation OSAGE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | OSAGE | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 8/18/2014 | Treatment End Date: | N/A | Treatment Summary: | 8-13-2014 No Treatment, Perf Osage 7937' - 7945' set packer @ 7887' SWAB all water
8-14-2014 Set CIBP @ 7920' with 2 sks cement
8-18-2014 CIBP @ 7920' leaking Set new CIBP @ 7290 with 2 sks cement plug and abandon Osage formation | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7887 ft. | Tubing Packer Depth: | 7887 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/13/2014 | Test Method: | SWAB | Hours Tested: | 8 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 22 | CALC_BBLS_H2O | 66 |
| Perforation Data: | Interval Top: | 7937 ft. | # Of Holes: | 52 | Interval Bottom: | 7945 ft. | Hole Size: | 0.25 in. |
|
Formation CHRK Formation Classification: OW Status: AB - 8/20/2014 Interval Top: 7170 ft. Interval Bottom: 7180 ft. Completed Information for Formation CHEROKEE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CHEROKEE | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 8/18/2014 | Treatment End Date: | 9/20/2014 | Treatment Summary: | 8-14-2014 perf Cherokee A formation 7170' - 7180'
8-18-2014 acid job 24 bbls 15% HCL, 43 bbls 2% KCL load 41 bbls broke @ 1500 psi SWAB recover 81 bbls water
8-19-2014 acid job 63 bbls 15% HCL, 60 bbls 2% KCL SWAB recover 143 bbls water
8-20-2014 SWAB recover 89 bbls water. Set CIBP @ 7150' with 2 sks cement plug and abandon Cherokee A | Total fluid used in treatment (bbls): | 190 | Max pressure during treatment (psi): | 1500 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 87 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 293 | Fresh water used in treatment (bbls): | 103 | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7105 ft. | Tubing Packer Depth: | 7105 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/18/2014 | Test Method: | SWAB | Hours Tested: | 8 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 27 | CALC_BBLS_H2O | 81 |
| Perforation Data: | Interval Top: | 7170 ft. | # Of Holes: | 40 | Interval Bottom: | 7180 ft. | Hole Size: | 0.25 in. |
|
Formation PAWNB Formation Classification: OW Status: PR - 7/1/2020 Interval Top: 7096 ft. Interval Bottom: 7108 ft. Completed Information for Formation PAWNEE B | 1st Production Date: | 8/28/2014 | Choke Size: | | Formation Name: | PAWNEE B | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 8/21/2014 | Treatment End Date: | 8/22/2014 | Treatment Summary: | 8-20-2014 perf Pawnee B 7096' - 7108'
8-21-2014 acid job 29 bbls 15% HCL, 42 bbls 2% KCL SWAB recover 69 bbls of oil and 105 bbls of water | Total fluid used in treatment (bbls): | 71 | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 29 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 172 | Fresh water used in treatment (bbls): | 42 | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7040 ft. | Tubing Packer Depth: | 7040 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/21/2014 | Test Method: | SWAB | Hours Tested: | 8 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 35 | BBLS_OIL | 23 | CALC_BBLS_H2O | 105 | CALC_BBLS_OIL | 69 | GRAVITY_OIL | 35 |
| Perforation Data: | Interval Top: | 7096 ft. | # Of Holes: | 48 | Interval Bottom: | 7108 ft. | Hole Size: | 0.25 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 2818 |
Total Gas Produced (MCF) | 2247 |
GOR | 797 |
GOR Determination | BOE |
Average BOE per Day | 8.790 |
Average MCFE per Day | 50.975 |
Federal Financial Assurance | i | |
|
|