|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 5/1/2025 Measured TD: 8308 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 5/1/2025 | Wellbore Permit | | Permit #: | | Expiration Date: | 11/25/2015 | Proposed Depth/Form: | 8800 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: ABCK , Formation: ARBUCKLE , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: ATOK , Formation: ATOKA , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: LGKC , Formation: LANSING-KANSAS CITY , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: SPGN , Formation: SPERGEN , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: STLS , Formation: ST LOUIS , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: WFCMP , Formation: WOLFCAMP , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: WRSW , Formation: WARSAW , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 300 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 69, Top: 0 ft., Bottom: 300 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8800 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 1120, Top: 0 ft., Bottom: 8800 ft. |
| | |
Wellbore Completed | Completion Date: | 5/6/2014 | Spud Date: | 4/23/2014 | Spud Date Is: | ACTUAL | Measured TD: | 8308 ft. | Measured PB depth: | 8180 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | Triple Combo, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 336 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 147, Top: 0 ft., Bottom: 337 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8303 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 1299, Top: 1026 ft., Bottom: 8304 ft., Determination Method: VISU | Formation | Interval Top | Log Bottom | Cored | DSTs | DAKOTA | 4315 ft. | | | | CHEYENNE | 4562 ft. | | | | STONE CORRAL | 5733 ft. | | | | WOLFCAMP | 5937 ft. | | | | LANSING-KANSAS CITY | 6701 ft. | | | | MARMATON | 6974 ft. | | | | CHEROKEE | 7298 ft. | | | | ATOKA | 7563 ft. | | | | MORROW | 7779 ft. | | | | MISSISSIPPIAN | 7956 ft. | | | | SPERGEN | 8031 ft. | | | | SIMPSON | 8134 ft. | | | |
Formation MSSP Formation Classification: OW Status: AB - 6/3/2014 Interval Top: 7992 ft. Interval Bottom: 8030 ft. Completed Information for Formation MISSISSIPPIAN | 1st Production Date: | N/A | Choke Size: | | Formation Name: | MISSISSIPPIAN | Commingled: | | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 5/15/2014 | Treatment End Date: | 5/27/2014 | Treatment Summary: | Acidize with 4,000 gallon of 15% HCI, 175 bio-balls sealers displaced with 70 bbls of 2% KCI water, | Total fluid used in treatment (bbls): | 166 | Max pressure during treatment (psi): | 3200 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 96 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 159 | Fresh water used in treatment (bbls): | 70 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: PIPELINE |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation MSSP. |
| Perforation Data: | Interval Top: | 7992 ft. | # Of Holes: | 152 | Interval Bottom: | 8030 ft. | Hole Size: | 0.02272727 in. |
|
Formation MRRW Formation Classification: OW Status: TA - 1/1/2024 Interval Top: 7800 ft. Interval Bottom: 7912 ft. Completed Information for Formation MORROW | 1st Production Date: | 6/24/2014 | Choke Size: | | Formation Name: | MORROW | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 10/5/2022 | Treatment End Date: | N/A | Treatment Summary: | re-perf 7800-7810' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 6/3/2014 | Treatment End Date: | 7/22/2014 | Treatment Summary: | Perf'd 7,800' - 7,810' & 7,836' - 7,848' 7,902' - 7,912'
Acidize with 26 bbls of 7 1/2% HCI and displace with 130 bbls of lease crude. (Recovered 134 bbls of lease crude)
Acidized again with 43 bbls of 7 1/2% HCI and displaced with 50 bbls of lease crude and 6 bbls of water to flush lines (recovered 55 bbls of lease crude) | Total fluid used in treatment (bbls): | 75 | Max pressure during treatment (psi): | 3000 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 69 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 162 | Fresh water used in treatment (bbls): | 6 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7740 ft. | Tubing Packer Depth: | 7736 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 223 | BTU_GAS | 1116 | CALC_BBLS_OIL | 223 | CASING_PRESS | 50 | GRAVITY_OIL | 43 | TUBING_PRESS | 2100 |
| Perforation Data: | Interval Top: | 7800 ft. | # Of Holes: | 10 | Interval Bottom: | 7912 ft. | Hole Size: | 0.02272727 in. |
|
Formation CHRK Formation Classification: GW Status: TA - 6/11/2015 Interval Top: 7288 ft. Interval Bottom: 7302 ft. Completed Information for Formation CHEROKEE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CHEROKEE | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 7/23/2014 | Treatment End Date: | 7/24/2014 | Treatment Summary: | Acidize with 36 bbls of 15% HCI and displaced with 50 bbls of 2% KCL water | Total fluid used in treatment (bbls): | 86 | Max pressure during treatment (psi): | 750 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 36 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | 50 | Total flowback volume recovered (bbls): | 77 | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 28 | BTU_GAS | 1116 | CALC_BBLS_H2O | 242 | CALC_BBLS_OIL | 28 | CALC_GOR | 1357 | CALC_MCF_GAS | 38 | CASING_PRESS | 68 | GRAVITY_OIL | 43 | MCF_GAS | 38 | TUBING_PRESS | 70 |
| Perforation Data: | Interval Top: | 7288 ft. | # Of Holes: | 40 | Interval Bottom: | 7302 ft. | Hole Size: | 0.44 in. |
|
Formation MRTN Formation Classification: OG Status: SI - 10/1/2022 Interval Top: 7230 ft. Interval Bottom: 7268 ft. Completed Information for Formation MARMATON | 1st Production Date: | 8/4/2014 | Choke Size: | | Formation Name: | MARMATON | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 7/29/2022 | Treatment End Date: | N/A | Treatment Summary: | JWC squeezed off the Marmaton perfs at 7010-7014 and 7150-7154. Drilled CIBP at 7220 and drilled out CIBP at 7780. We have open perfs above the packer that are not producing. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 5/13/2015 | Treatment End Date: | 5/18/2015 | Treatment Summary: | Perforated 7010-7014
Acidized with 600 gallons (14.3 bbls) with additives and displaced with 44 bbls of 2% KCL water. | Total fluid used in treatment (bbls): | 58 | Max pressure during treatment (psi): | 1500 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 14 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | 44 | Total flowback volume recovered (bbls): | 71 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 7/25/2014 | Treatment End Date: | 8/5/2014 | Treatment Summary: | 3 shots did not fire - Acidized with 46 bbls of 15% HCL with additives. Displaced with 52 bbls of 2% KCL (10 bbls into formation) | Total fluid used in treatment (bbls): | 108 | Max pressure during treatment (psi): | 510 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 46 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | 62 | Total flowback volume recovered (bbls): | 335 | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 193 | BBLS_OIL | 12 | BTU_GAS | 1116 | CALC_BBLS_H2O | 193 | CALC_BBLS_OIL | 12 | CALC_GOR | 1357 | CALC_MCF_GAS | 38 | CASING_PRESS | 45 | GRAVITY_OIL | 40 | MCF_GAS | 38 | TUBING_PRESS | 60 |
| Perforation Data: | Interval Top: | 7230 ft. | # Of Holes: | 109 | Interval Bottom: | 7268 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 04/30/2024 |
Low Producing | Y | Production Period 04/2024 - 03/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|