Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-073-06563
Well Classification: OW Status: SI - 7/1/2025
Well Name/No:JOHN CRAIG #2-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:JWC OPERATING LLC - 10762
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2025
FacilityID:435194LocationID:435195
County:LINCOLN #073Location:Lot 2 2 10S56W 6
Field:OLD HOMESTEAD - #60634Elevation:5257 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:837FNL  1842 FELLat/Long: 39.212840 / -103.628100Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.212840 / -103.628100Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 7/1/2025             Measured TD: 8308 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 7/1/2025
Wellbore Permit
Permit #: Expiration Date:11/25/2015
Proposed Depth/Form:8800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: ABCK , Formation: ARBUCKLE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: ATOK , Formation: ATOKA , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: LGKC , Formation: LANSING-KANSAS CITY , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SPGN , Formation: SPERGEN , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: STLS , Formation: ST LOUIS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WFCMP , Formation: WOLFCAMP , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WRSW , Formation: WARSAW , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 300 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 69, Top: 0 ft., Bottom: 300 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8800 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1120, Top: 0 ft., Bottom: 8800 ft.

Wellbore Completed
Completion Date:5/6/2014
Spud Date:4/23/2014Spud Date Is:ACTUAL
Measured TD:8308 ft.Measured PB depth:8180 ft.
True Vertical TD:True Vertical PB depth:
Log Types:Triple Combo, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 336 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 147, Top: 0 ft., Bottom: 337 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8303 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1299, Top: 1026 ft., Bottom: 8304 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
DAKOTA4315 ft.
CHEYENNE4562 ft.
STONE CORRAL5733 ft.
WOLFCAMP5937 ft.
LANSING-KANSAS CITY6701 ft.
MARMATON6974 ft.
CHEROKEE7298 ft.
ATOKA7563 ft.
MORROW7779 ft.
MISSISSIPPIAN7956 ft.
SPERGEN8031 ft.
SIMPSON8134 ft.

Formation MSSP                     Formation Classification:  OW                     Status:  AB - 6/3/2014                  Interval Top: 7992 ft.    Interval Bottom: 8030 ft.

 Completed Information for Formation MISSISSIPPIAN
1st Production Date:N/AChoke Size: 
Formation Name:MISSISSIPPIANCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/15/2014Treatment End Date:5/27/2014
Treatment Summary:Acidize with 4,000 gallon of 15% HCI, 175 bio-balls sealers displaced with 70 bbls of 2% KCI water,
Total fluid used in treatment (bbls):166Max pressure during treatment (psi):3200
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):96Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):159
Fresh water used in treatment (bbls):70Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation MSSP.
Perforation Data:
Interval Top:7992 ft.# Of Holes:152
Interval Bottom:8030 ft.Hole Size:0.02272727 in.

Formation MRRW                     Formation Classification:  OW                     Status:  TA - 1/1/2024                  Interval Top: 7800 ft.    Interval Bottom: 7912 ft.

 Completed Information for Formation MORROW
1st Production Date:6/24/2014Choke Size: 
Formation Name:MORROWCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/5/2022Treatment End Date:N/A
Treatment Summary:re-perf 7800-7810'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/3/2014Treatment End Date:7/22/2014
Treatment Summary:Perf'd 7,800' - 7,810' & 7,836' - 7,848' 7,902' - 7,912' Acidize with 26 bbls of 7 1/2% HCI and displace with 130 bbls of lease crude. (Recovered 134 bbls of lease crude) Acidized again with 43 bbls of 7 1/2% HCI and displaced with 50 bbls of lease crude and 6 bbls of water to flush lines (recovered 55 bbls of lease crude)
Total fluid used in treatment (bbls):75Max pressure during treatment (psi):3000
Total gas used in treatment (mcf):0Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):69Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):162
Fresh water used in treatment (bbls):6Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:7740 ft.
Tubing Packer Depth:7736 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 223
BTU_GAS 1116
CALC_BBLS_OIL 223
CASING_PRESS 50
GRAVITY_OIL 43
TUBING_PRESS 2100
Perforation Data:
Interval Top:7800 ft.# Of Holes:10
Interval Bottom:7912 ft.Hole Size:0.02272727 in.

Formation CHRK                     Formation Classification:  GW                     Status:  TA - 6/11/2015                 Interval Top: 7288 ft.    Interval Bottom: 7302 ft.

 Completed Information for Formation CHEROKEE
1st Production Date:N/AChoke Size: 
Formation Name:CHEROKEECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/23/2014Treatment End Date:7/24/2014
Treatment Summary:Acidize with 36 bbls of 15% HCI and displaced with 50 bbls of 2% KCL water
Total fluid used in treatment (bbls):86Max pressure during treatment (psi):750
Total gas used in treatment (mcf):0Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):36Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):50Total flowback volume recovered (bbls):77
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 28
BTU_GAS 1116
CALC_BBLS_H2O 242
CALC_BBLS_OIL 28
CALC_GOR 1357
CALC_MCF_GAS 38
CASING_PRESS 68
GRAVITY_OIL 43
MCF_GAS 38
TUBING_PRESS 70
Perforation Data:
Interval Top:7288 ft.# Of Holes:40
Interval Bottom:7302 ft.Hole Size:0.44 in.

Formation MRTN                     Formation Classification:  OG                     Status:  SI - 7/1/2025                  Interval Top: 7230 ft.    Interval Bottom: 7268 ft.

 Completed Information for Formation MARMATON
1st Production Date:8/4/2014Choke Size: 
Formation Name:MARMATONCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2022Treatment End Date:N/A
Treatment Summary:JWC squeezed off the Marmaton perfs at 7010-7014 and 7150-7154. Drilled CIBP at 7220 and drilled out CIBP at 7780. We have open perfs above the packer that are not producing.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/13/2015Treatment End Date:5/18/2015
Treatment Summary:Perforated 7010-7014 Acidized with 600 gallons (14.3 bbls) with additives and displaced with 44 bbls of 2% KCL water.
Total fluid used in treatment (bbls):58Max pressure during treatment (psi):1500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):14Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):44Total flowback volume recovered (bbls):71
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/25/2014Treatment End Date:8/5/2014
Treatment Summary:3 shots did not fire - Acidized with 46 bbls of 15% HCL with additives. Displaced with 52 bbls of 2% KCL (10 bbls into formation)
Total fluid used in treatment (bbls):108Max pressure during treatment (psi):510
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):46Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):62Total flowback volume recovered (bbls):335
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 193
BBLS_OIL 12
BTU_GAS 1116
CALC_BBLS_H2O 193
CALC_BBLS_OIL 12
CALC_GOR 1357
CALC_MCF_GAS 38
CASING_PRESS 45
GRAVITY_OIL 40
MCF_GAS 38
TUBING_PRESS 60
Perforation Data:
Interval Top:7230 ft.# Of Holes:109
Interval Bottom:7268 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)4450
GOR
GOR DeterminationMCFE
Average BOE per Day2.100
Average MCFE per Day12.165

 Federal Financial Assurance  i 

 Tribal Well  i No