|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/1/2013 Measured TD: 8370 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/1/2013 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 10/2/2015 | | Proposed Depth/Form: | 8700 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ABCK , Formation: ARBUCKLE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: ATOK , Formation: ATOKA , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: LGKC , Formation: LANSING-KANSAS CITY , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MS-SL , Formation: MISSISSIPPIAN-ST LOUIS , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SPGN , Formation: SPERGEN , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WFCMP , Formation: WOLFCAMP , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WRSW , Formation: WARSAW , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 300 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 69, Top: 0 ft., Bottom: 300 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8700 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1039, Top: 0 ft., Bottom: 8700 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/26/2013 | | Spud Date: | 10/11/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 8370 ft. | Measured PB depth: | 8370 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | Triple Combo
CBL | | Casing: | String Type: SURF, Hole Size: 12.5 in., Size: 8.63 in., Top: 0 ft., Depth: 337 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 114, Top: 0 ft., Bottom: 337 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8381 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1025, Top: 2655 ft., Bottom: 8381 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 4077 ft. | | N | | | DAKOTA | 4602 ft. | | N | | | STONE CORRAL | 6011 ft. | | N | | | WOLFCAMP | 6192 ft. | | N | | | LANSING-KANSAS CITY | 6931 ft. | | N | | | MARMATON | 7243 ft. | | N | | | CHEROKEE | 7425 ft. | | N | | | ATOKA | 7637 ft. | | N | | | MORROW | 7869 ft. | | N | | | SPERGEN | 8058 ft. | | N | | | SIMPSON | 8149 ft. | | N | |
Formation SIMSN Formation Classification: OW Status: TA - 11/15/2013 Interval Top: 8166 ft. Interval Bottom: 8282 ft.| Completed Information for Formation SIMPSON | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | SIMPSON | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/6/2013 | Treatment End Date: | 11/14/2013 | | Treatment Summary: | Perf'd 8270-8282- Set CIBP @ 8266'
Perf'd 8226-8238 - stimulated with 142 bbls of produced water - Set CIBP @ 8220'
perf'd 8192-8206 - Set CIBP @ 8186' | | Total fluid used in treatment (bbls): | 142 | Max pressure during treatment (psi): | 1450 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 142 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SIMSN. |
| | Perforation Data: | | Interval Top: | 8166 ft. | # Of Holes: | 264 | | Interval Bottom: | 8282 ft. | Hole Size: | 0.52 in. |
|
Formation SPGN Formation Classification: OW Status: PR - 12/1/2013 Interval Top: 8106 ft. Interval Bottom: 8146 ft.| Completed Information for Formation SPERGEN | | 1st Production Date: | 12/22/2013 | Choke Size: | | | Formation Name: | SPERGEN | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/13/2016 | Treatment End Date: | N/A | | Treatment Summary: | CIBP set @ 8,160' closing off 6' of the Simpson
Interval previously submitted as 8,106 - 8,282 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | No | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 11/25/2013 | Treatment End Date: | 12/2/2013 | | Treatment Summary: | 6,000 gallons of 7.5% acetic acid with inhibitors and 10 gallons of BC-1 asphaltine solvent.
The interval treated was ONLY 8,106' -8,146'. CIBP set at 8,160', 8,186', 8,220', & 8,266' | | Total fluid used in treatment (bbls): | 366 | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 142 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | 233 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 150 | | BBLS_OIL | 30 | | CALC_BBLS_H2O | 98 | | CALC_BBLS_OIL | 144 | | CASING_PRESS | 75 | | GRAVITY_OIL | 36 | | TUBING_PRESS | 45 |
| | Perforation Data: | | Interval Top: | 8106 ft. | # Of Holes: | 128 | | Interval Bottom: | 8146 ft. | Hole Size: | 0.52 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 13232 |
| Total Gas Produced (MCF) | 5045 |
| GOR | 381 |
| GOR Determination | BOE |
| Average BOE per Day | 38.585 |
| Average MCFE per Day | 223.808 |
| Federal Financial Assurance | i | |
|
|