|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/1/2020 Measured TD: 8058 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/1/2020 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 2/12/2015 | | Proposed Depth/Form: | 8400 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ATOK , Formation: ATOKA , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: FRSC , Formation: FORT SCOTT , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: KEYES , Formation: KEYES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: LNSNG , Formation: LANSING , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PAWNA , Formation: PAWNEE A , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PAWNB , Formation: PAWNEE B , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: TORCH , Formation: TORCH , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 300 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 300 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8400 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 6500 ft., Bottom: 8400 ft. | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: 3950 ft., Bottom: 4550 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/9/2013 | | Spud Date: | 6/11/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 8058 ft. | Measured PB depth: | 7740 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | High Resolution Induction
Compensated Density Compensated Neuton Gamma Ray
Radial Cement Bond Log | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 300 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 165, Top: 0 ft., Bottom: 300 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8050 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 323, Top: 5300 ft., Bottom: 8050 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 3000 ft., Depth: 4558 ft., Bottom: 4558 ft., Sacks: 250, Method: STAGE TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 3152 ft. | | | | | CODELL | 3693 ft. | | | | | CEDAR HILLS | 5342 ft. | | | | | LANSING | 6636 ft. | | | | | TORCH | 6988 ft. | | | | | PAWNEE A | 7026 ft. | | | | | CHEROKEE | 7107 ft. | 7157 ft. | | Y | | MORROW | 7618 ft. | | | | | OSAGE | 7940 ft. | | | |
Formation OSAGE Formation Classification: OW Status: AB - 7/19/2013 Interval Top: 7942 ft. Interval Bottom: 7966 ft.| Completed Information for Formation OSAGE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | OSAGE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 7/19/2013 | Treatment End Date: | N/A | | Treatment Summary: | No treatment, SWAB recovered 51 bbls water no oil or gas | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7980 ft. | | Tubing Packer Depth: | 7980 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/18/2013 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 17 | | CALC_BBLS_H2O | 51 |
| | Perforation Data: | | Interval Top: | 7942 ft. | # Of Holes: | 96 | | Interval Bottom: | 7966 ft. | Hole Size: | 0.25 in. |
|
Formation MRRW Formation Classification: OW Status: AB - 7/23/2013 Interval Top: 7761 ft. Interval Bottom: 7774 ft.| Completed Information for Formation MORROW | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | MORROW | Commingled: | | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 7/19/2013 | Treatment End Date: | 7/23/2013 | | Treatment Summary: | Acid Job 31 bbl 12.5% HCL, 46.5 bbl 6% KCL | | Total fluid used in treatment (bbls): | 77 | Max pressure during treatment (psi): | 1600 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 31 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 72 | | Fresh water used in treatment (bbls): | 46 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7694 ft. | | Tubing Packer Depth: | 7694 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/19/2013 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 24 | | CALC_BBLS_H2O | 72 |
| | Perforation Data: | | Interval Top: | 7761 ft. | # Of Holes: | 48 | | Interval Bottom: | 7774 ft. | Hole Size: | 0.25 in. |
|
Formation CHRK Formation Classification: OW Status: AB - 3/3/2014 Interval Top: 7116 ft. Interval Bottom: 7136 ft.| Completed Information for Formation CHEROKEE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CHEROKEE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 3/3/2014 | Treatment End Date: | N/A | | Treatment Summary: | No treatment 3-3-2014, Set CIBP @ 7100 with 2 sks cement plug and abandon Cherokee A formation | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 7/29/2013 | Treatment End Date: | 7/30/2013 | | Treatment Summary: | Acid Job 38 bbl 15% HCL, 43 bbl 2% KCL | | Total fluid used in treatment (bbls): | 81 | Max pressure during treatment (psi): | 1500 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 38 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 111 | | Fresh water used in treatment (bbls): | 43 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 21 | | BBLS_OIL | 4 | | CALC_BBLS_H2O | 63 | | CALC_BBLS_OIL | 12 | | GRAVITY_OIL | 38 |
| | Perforation Data: | | Interval Top: | 7116 ft. | # Of Holes: | 44 | | Interval Bottom: | 7136 ft. | Hole Size: | 0.25 in. |
|
Formation PAWNB Formation Classification: OW Status: AB - 3/5/2014 Interval Top: 7046 ft. Interval Bottom: 7060 ft.| Completed Information for Formation PAWNEE B | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | PAWNEE B | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 3/3/2014 | Treatment End Date: | 3/5/2014 | | Treatment Summary: | Acid Job 33 bbl 15% HCL, 42 bbl 2% KCL | | Total fluid used in treatment (bbls): | 75 | Max pressure during treatment (psi): | 800 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 33 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 75 | | Fresh water used in treatment (bbls): | 42 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7000 ft. | | Tubing Packer Depth: | 7000 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/3/2014 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | CALC_BBLS_H2O | 75 |
| | Perforation Data: | | Interval Top: | 7046 ft. | # Of Holes: | 56 | | Interval Bottom: | 7060 ft. | Hole Size: | 0.25 in. |
|
Formation TORCH Formation Classification: OW Status: PR - 7/1/2020 Interval Top: 6986 ft. Interval Bottom: 7002 ft.| Completed Information for Formation TORCH | | 1st Production Date: | 3/27/2014 | Choke Size: | | | Formation Name: | TORCH | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 3/5/2014 | Treatment End Date: | 3/10/2014 | | Treatment Summary: | Acid Job 38 bbl 15% HCL, 42 bbl 2% KCL | | Total fluid used in treatment (bbls): | 80 | Max pressure during treatment (psi): | 1100 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 38 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 86 | | Fresh water used in treatment (bbls): | 42 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6904 ft. | | Tubing Packer Depth: | 6904 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/5/2014 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 18 | | BBLS_OIL | 10 | | CALC_BBLS_H2O | 54 | | CALC_BBLS_OIL | 30 | | GRAVITY_OIL | 38 |
| | Perforation Data: | | Interval Top: | 6986 ft. | # Of Holes: | 64 | | Interval Bottom: | 7002 ft. | Hole Size: | 0.25 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 831 |
| Total Gas Produced (MCF) | 562 |
| GOR | 676 |
| GOR Determination | BOE |
| Average BOE per Day | 2.548 |
| Average MCFE per Day | 14.760 |
| Federal Financial Assurance | i | |
|
|