|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 5/1/2025 Measured TD: 7900 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 5/1/2025 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 8/18/2016 | | Proposed Depth/Form: | 7900 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | STATE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: LNSNG , Formation: LANSING , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PAWNA , Formation: PAWNEE A , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 329 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 0 ft., Bottom: 329 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7247 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 450, Top: 2900 ft., Bottom: 7247 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/11/2011 | | Spud Date: | 2/21/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7900 ft. | Measured PB depth: | 7247 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | Compensated Density Compensated Neutron
High Resolution Induction Guard Log Gamma Ray
Dual Spaced Cement Bond Log | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 329 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 0 ft., Bottom: 329 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7247 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 450, Top: 2900 ft., Bottom: 7247 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 7010 ft., Depth: , Bottom: 7200 ft., Sacks: 150, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | J-NIOBRARA | 3045 ft. | | | | | CODELL | 3598 ft. | | | | | DAKOTA | 4049 ft. | | | | | SHAWNEE | 5642 ft. | | | | | LANSING | 6589 ft. | | | | | MARMATON | 6940 ft. | | | Y | | PAWNEE A | 6964 ft. | | | | | CHEROKEE | 7034 ft. | | | Y | | CHEROKEE-MORROW | 7116 ft. | | | Y | | MORROW | 7733 ft. | | | | | KEYES | 7756 ft. | | | |
Formation CHRK Formation Classification: Status: AB - 3/29/2011 Interval Top: 7024 ft. Interval Bottom: 7048 ft.| Completed Information for Formation CHEROKEE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CHEROKEE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/23/2011 | | Treatment Summary: | Acid Job 1800 gal 15% MCA 40 bbls 2% KCL |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6996 ft. | | Tubing Packer Depth: | 6996 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/24/2011 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 30 | | CALC_BBLS_H2O | 120 |
| | Perforation Data: | | Interval Top: | 7024 ft. | # Of Holes: | 88 | | Interval Bottom: | 7048 ft. | Hole Size: | 0.25 in. |
|
Formation PAWNB Formation Classification: OW Status: AB - 9/25/2014 Interval Top: 6980 ft. Interval Bottom: 6992 ft.| Completed Information for Formation PAWNEE B | | 1st Production Date: | 4/10/2011 | Choke Size: | | | Formation Name: | PAWNEE B | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 9/25/2014 | Treatment End Date: | N/A | | Treatment Summary: | set CIBP @ 6976 with 2 sks cement plug and abandon Marmation formation due to low oil production | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 3/30/2011 | | Treatment Summary: | Acid Job 1200 gal HCL 40 bbls 2% KCL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 57 | | BBLS_OIL | 38 | | CALC_BBLS_H2O | 171 | | CALC_BBLS_OIL | 114 | | CASING_PRESS | 500 | | GRAVITY_OIL | 35 | | TUBING_PRESS | 110 |
| | Perforation Data: | | Interval Top: | 6980 ft. | # Of Holes: | 48 | | Interval Bottom: | 6992 ft. | Hole Size: | 0.25 in. |
|
Formation PAWNA Formation Classification: OW Status: AB - 8/27/2014 Interval Top: 6964 ft. Interval Bottom: 6974 ft.| Completed Information for Formation PAWNEE A | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | PAWNEE A | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 8/26/2014 | Treatment End Date: | N/A | | Treatment Summary: | Acid job 24 bbls 15% HCL, 42 bbls 2% KCL SWAB recover all water
| | Total fluid used in treatment (bbls): | 66 | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 135 | | Fresh water used in treatment (bbls): | 42 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6922 ft. | | Tubing Packer Depth: | 6922 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/26/2014 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 45 | | CALC_BBLS_H2O | 135 |
| | Perforation Data: | | Interval Top: | 6964 ft. | # Of Holes: | 40 | | Interval Bottom: | 6974 ft. | Hole Size: | 0.25 in. |
|
Formation LNSNG Formation Classification: OW Status: SI - 5/1/2025 Interval Top: 6900 ft. Interval Bottom: 6908 ft.| Completed Information for Formation LANSING | | 1st Production Date: | 9/3/2014 | Choke Size: | | | Formation Name: | LANSING | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 8/27/2014 | Treatment End Date: | N/A | | Treatment Summary: | acid job 19 bbls 15% HCL, 42 bbls 2% KCL SWAB | | Total fluid used in treatment (bbls): | 61 | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 19 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 153 | | Fresh water used in treatment (bbls): | 42 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6857 ft. | | Tubing Packer Depth: | 6857 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/28/2014 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 49 | | BBLS_OIL | 2 | | CALC_BBLS_H2O | 147 | | CALC_BBLS_OIL | 6 | | GRAVITY_OIL | 36 |
| | Perforation Data: | | Interval Top: | 6900 ft. | # Of Holes: | 32 | | Interval Bottom: | 6908 ft. | Hole Size: | 0.25 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 261 |
| Total Gas Produced (MCF) | 169 |
| GOR | 647 |
| GOR Determination | BOE |
| Average BOE per Day | 0.790 |
| Average MCFE per Day | 4.585 |
| Federal Financial Assurance | i | |
|
|