Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-073-06404
Well Classification: OW Status: TA - 7/17/2023
Well Name/No:CRAIG #6-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KTM OPERATING LLC - 10722
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date7/17/2023
FacilityID:415730LocationID:415505
County:LINCOLN #073Location:SENW 4 14S55W 6
Field:BOLERO - #7153Elevation:5092 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FNL  1980 FWLLat/Long: 38.859870 / -103.564020Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 38.859870 / -103.564020Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 7/17/2023             Measured TD: 7315 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 7/17/2023
Wellbore Permit
Permit #: Expiration Date:2/18/2012
Proposed Depth/Form:8000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: MSSP , Formation: MISSISSIPPIAN , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: ORDV , Formation: ORDOVICIAN , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: PENN , Formation: PENNSYLVANIAN , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: , Depth: 400 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 350, Top: , Bottom: 400 ft.
Casing:String Type: 1ST, Hole Size: 8.12 in., Size: 7 in., Top: , Depth: 8000 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 3100 ft., Bottom: 8000 ft.

Wellbore Completed
Completion Date:5/5/2010
Spud Date:4/19/2010Spud Date Is:ACTUAL
Measured TD:7315 ft.Measured PB depth:7308 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL
Log Types:COMPENSATED NEUTRON, COMPENSATED SONIC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 765 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 0 ft., Bottom: 765 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7299 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 6364 ft., Bottom: 7299 ft., Determination Method: CBL
Additional Cement:String Type: 2ND , Top: 6364 ft., Depth: 6510 ft., Bottom: 7299 ft., Sacks: 100, Method:
Additional Cement:String Type: S.C. 1.1 , Top: , Depth: 3835 ft., Bottom: , Sacks: 150, Method: STAGE TOOL
Additional Cement:String Type: S.C. 1.1 , Top: 2834 ft., Depth: 3805 ft., Bottom: 3810 ft., Sacks: 150, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
CHEROKEE6485 ft.
ATOKA6720 ft.
MORROW7143 ft.

Formation ATOK                     Formation Classification:  OW                     Status:  TA - 8/1/2018                  Interval Top: 6957 ft.    Interval Bottom: 7044 ft.

 Completed Information for Formation ATOKA
1st Production Date:7/31/2010Choke Size: 
Formation Name:ATOKACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:8/12/2013Treatment End Date:N/A
Treatment Summary:No treatment completed on this formation
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:7/27/2010
Treatment Summary:SPEARHEAD W/2000 GALS 15% HCL THEN FRAC W/24,760# 20/40 SAND AND 998 BBLS OF X-LINKED GELLED WATER.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 33
BBLS_OIL 4
CALC_BBLS_H2O 33
CALC_BBLS_OIL 4
Perforation Data:
Interval Top:6957 ft.# Of Holes:261
Interval Bottom:7044 ft.Hole Size:0.42 in.

Formation CHRK                     Formation Classification:  OW                     Status:  TA - 7/17/2023                 Interval Top: 6593 ft.    Interval Bottom: 6603 ft.

 Completed Information for Formation CHEROKEE
1st Production Date:7/31/2010Choke Size: 
Formation Name:CHEROKEECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/13/2013Treatment End Date:8/13/2013
Treatment Summary:Acidize with 1000 gals 15% HCL Reaxe Acid
Total fluid used in treatment (bbls):84Max pressure during treatment (psi):680
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):60Total flowback volume recovered (bbls):57
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Formation Treatment
Treatment Date:6/29/2010
Treatment Summary:SPEARHEAD W/ 1000 GALS 15% HCL THEN FRAC W/ 19,913 # 20/40 SAND AND 790 BLLS X-LINKED GELLED WATER.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 57
BBLS_OIL 12
CALC_BBLS_H2O 57
CALC_BBLS_OIL 16
Perforation Data:
Interval Top:6593 ft.# Of Holes:3
Interval Bottom:6603 ft.Hole Size:0.42 in.

Formation MRTN                     Formation Classification:  OW                     Status:  TA - 7/17/2023                 Interval Top: 6454 ft.    Interval Bottom: 6456 ft.

 Completed Information for Formation MARMATON
1st Production Date:N/AChoke Size: 
Formation Name:MARMATONCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/15/2013Treatment End Date:8/16/2013
Treatment Summary:Acidize with 300 gals 15% HCL on 8/15/13 Acidize with 1000 gals 15% HCL on 8/16/13
Total fluid used in treatment (bbls):201Max pressure during treatment (psi):110
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):38Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):163Total flowback volume recovered (bbls):201
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/16/2013Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 109
CALC_BBLS_H2O 109
Perforation Data:
Interval Top:6454 ft.# Of Holes:8
Interval Bottom:6456 ft.Hole Size:0.52 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
07/31/2013
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No