|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2025 Measured TD: 7850 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2025 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 6/19/2013 | | Proposed Depth/Form: | 8000 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ABCK , Formation: ARBUCKLE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: KEYES , Formation: KEYES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: LNSNG , Formation: LANSING , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 302 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 175, Top: 0 ft., Bottom: 302 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8000 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 6500 ft., Bottom: 8000 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/5/2011 | | Spud Date: | 7/21/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7850 ft. | Measured PB depth: | 7341 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMPENSATED NEUTRON/DENSITY/GAMMA RAY, DUAL INDUCTION | | Log Types: | High Resoulution Induction
Radial Cement Bond Log | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 302 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 175, Top: 0 ft., Bottom: 302 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7341 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 125, Top: 6300 ft., Bottom: 7341 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 3070 ft., Depth: 4566 ft., Bottom: 4566 ft., Sacks: 250, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 3160 ft. | | | | | CODELL | 3709 ft. | | | | | DAKOTA | 4150 ft. | | | | | CHEYENNE | 4403 ft. | | N | N | | SHAWNEE | 6625 ft. | | | | | LANSING-KANSAS CITY | 6653 ft. | | N | N | | LANSING | 6653 ft. | | | | | MARMATON | 7002 ft. | | | Y | | PAWNEE | 7036 ft. | | | Y | | CHEROKEE | 7115 ft. | | | |
Formation CHRK Formation Classification: OW Status: AB - 8/17/2011 Interval Top: 7156 ft. Interval Bottom: 7170 ft.| Completed Information for Formation CHEROKEE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CHEROKEE | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/15/2011 | | Treatment Summary: | Acid Job 1400 gal acid 15% HCL, 43 bbls 2% KCL |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7086 ft. | | Tubing Packer Depth: | 7086 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CHRK. |
| | Perforation Data: | | Interval Top: | 7156 ft. | # Of Holes: | 52 | | Interval Bottom: | 7170 ft. | Hole Size: | 0.25 in. |
|
Formation PAWN Formation Classification: OW Status: PR - 10/1/2025 Interval Top: 7048 ft. Interval Bottom: 7054 ft.| Completed Information for Formation PAWNEE | | 1st Production Date: | 9/1/2011 | Choke Size: | | | Formation Name: | PAWNEE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/17/2011 | | Treatment Summary: | Acid job 600 gal 15% acid, 42 bbls 3% KCL |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7084 ft. | | Tubing Packer Depth: | 6978 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/17/2011 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | DRY | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 30 | | BBLS_OIL | 14 | | BTU_GAS | 1500 | | CALC_BBLS_H2O | 90 | | CALC_BBLS_OIL | 42 | | CALC_MCF_GAS | 30 | | GRAVITY_OIL | 35 | | MCF_GAS | 10 |
| | Perforation Data: | | Interval Top: | 7048 ft. | # Of Holes: | 24 | | Interval Bottom: | 7054 ft. | Hole Size: | 0.25 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1295 |
| Total Gas Produced (MCF) | 1207 |
| GOR | 932 |
| GOR Determination | BOE |
| Average BOE per Day | 3.770 |
| Average MCFE per Day | 21.902 |
| Federal Financial Assurance | i | |
|
|