Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09879
Well Classification: CBM Status: PR - 8/17/2012
Well Name/No:APACHE CANYON #30-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/17/2012
FacilityID:423974LocationID:423975
County:LAS ANIMAS #071Location:NWSW 30 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8256 ft.
Planned Location:1746FSL  164 FWLLat/Long: 37.052828 / -104.937093Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.052821 / -104.937084Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/9/2012
End Date: 7/9/2012
Reported: 7/26/2012
Days to report: 17
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/17/2012             Measured TD: 2566 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/17/2012
Wellbore Permit
Permit #: Expiration Date:6/28/2013
Proposed Depth/Form:2566 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 45 ft., Weight: 54 , Citings Type: PLANNED
Cement:Sacks: 98, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 375 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 250, Top: 0 ft., Bottom: 375 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2566 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 1858 ft., Bottom: 2566 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1858 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 1858 ft.

Wellbore Completed
Completion Date:7/22/2011
Spud Date:7/20/2011Spud Date Is:ACTUAL
Measured TD:2566 ft.Measured PB depth:2492 ft.
True Vertical TD:True Vertical PB depth:
Log Types:OH, CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: 54.50 , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 0 ft., Bottom: 46 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 468 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 0 ft., Bottom: 468 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2538 ft., Weight: 15.50 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 106 ft., Bottom: 2538 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.NN
VERMEJO COAL2042 ft.NN
TRINIDAD2387 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/17/2012                 Interval Top: 534 ft.    Interval Bottom: 2308 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/16/2012Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/9/2012Treatment End Date:7/9/2012
Treatment Summary:Pumped 4,000 gals 15% HCl acid. Frac'd w/328,046 gals 20# Delta 140 w/sandwedge OS carrying 388,960# 16/30 Brady sand.
Total fluid used in treatment (bbls):7906Max pressure during treatment (psi):3285
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:4
Total acid used in treatment (bbls):96Min frac gradient (psi/ft):1.48
Recycled water used in treatment (bbls):7765Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):388960Green completions techniques utilized:No
Reason green techniques Not utilized: PRESSURE
Tubing Size:2.875 in.Tubing Setting Depth:2389 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/17/2012Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1009
CALC_BBLS_H2O 117
CASING_PRESS 1
GRAVITY_OIL 1
TUBING_PRESS 5
Perforation Data:
Interval Top:534 ft.# Of Holes:119
Interval Bottom:2308 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)35429
GOR
GOR DeterminationMCFE
Average BOE per Day16.725
Average MCFE per Day96.994

 Federal Financial Assurance  i 

 Tribal Well  i No