|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 8/21/2011 Measured TD: 2125 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 8/21/2011 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 5/28/2013 | | Proposed Depth/Form: | 2125 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 45 ft., Weight: 54 , Citings Type: PLANNED | | Cement: | Sacks: 98, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 250 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 160, Top: 0 ft., Bottom: 250 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2125 ft., Weight: 15.5 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 1421 ft., Bottom: 2125 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1421 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 0 ft., Bottom: 0 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/22/2011 | | Spud Date: | 6/20/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 2125 ft. | Measured PB depth: | 2045 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | OH, CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: 54.50 , Citings Type: ACTUAL | | Cement: | Sacks: 45, Top: 0 ft., Bottom: 46 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 455 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 198, Top: 0 ft., Bottom: 455 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2092 ft., Weight: 15.50 , Citings Type: ACTUAL | | Cement: | Sacks: 295, Top: 0 ft., Bottom: 2092 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | | N | N | | VERMEJO COAL | 1536 ft. | | N | N | | TRINIDAD | 1899 ft. | | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 10/10/2011 Interval Top: 1563 ft. Interval Bottom: 1790 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 8/17/2011 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/3/2011 | | Treatment Summary: | Acidized w/1,000 gals 15% HCl acid. Frac'd w/34,080 gals 20# Delta 140 w/Sandwedge OS carrying 114,635# 16/30 Nebraska sd. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation VRMJ. |
| | Perforation Data: | | Interval Top: | 1563 ft. | # Of Holes: | 30 | | Interval Bottom: | 1790 ft. | Hole Size: | 0.42 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 8/21/2011 Interval Top: 533 ft. Interval Bottom: 1790 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 8/17/2011 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1894 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/21/2011 | Test Method: | Pumping | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 29 | | BTU_GAS | 996 | | CALC_BBLS_H2O | 29 | | CALC_MCF_GAS | 108 | | CASING_PRESS | 17 | | MCF_GAS | 108 | | TUBING_PRESS | 3 |
| | Perforation Data: | | Interval Top: | 533 ft. | # Of Holes: | 96 | | Interval Bottom: | 1790 ft. | Hole Size: | 0.42 in. |
|
Formation RTON Formation Classification: GW Status: CM - 10/10/2011 Interval Top: 533 ft. Interval Bottom: 828 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 8/17/2011 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/3/2011 | | Treatment Summary: | Acidized w/2,000 gals 15% HCl acid. Frac'd w/114,931 gals 20# Delta 140 w/Sandwedge OS carrying 299,681# 16/30 Nebraska sd. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RTON. |
| | Perforation Data: | | Interval Top: | 533 ft. | # Of Holes: | 66 | | Interval Bottom: | 828 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 34216 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 16.151 |
| Average MCFE per Day | 93.680 |
| Federal Financial Assurance | i | |
|
|