Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09868
Well Classification: CBM Status: PR - 8/21/2011
Well Name/No:APACHE CANYON #20-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/21/2011
FacilityID:423391LocationID:423390
County:LAS ANIMAS #071Location:NESW 20 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7610 ft.
Basin:RATON BASIN  
Planned Location:1987FSL  1907 FWLLat/Long: 37.067970 / -104.913739Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.067970 / -104.913739Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/3/2011
End Date: 8/3/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 257
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/21/2011             Measured TD: 2125 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/21/2011
Wellbore Permit
Permit #: Expiration Date:5/28/2013
Proposed Depth/Form:2125 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 45 ft., Weight: 54 , Citings Type: PLANNED
Cement:Sacks: 98, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 250 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 160, Top: 0 ft., Bottom: 250 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2125 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 1421 ft., Bottom: 2125 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1421 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 220, Top: 0 ft., Bottom: 0 ft.

Wellbore Completed
Completion Date:6/22/2011
Spud Date:6/20/2011Spud Date Is:ACTUAL
Measured TD:2125 ft.Measured PB depth:2045 ft.
True Vertical TD:True Vertical PB depth:
Log Types:OH, CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: 54.50 , Citings Type: ACTUAL
Cement:Sacks: 45, Top: 0 ft., Bottom: 46 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 455 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 198, Top: 0 ft., Bottom: 455 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2092 ft., Weight: 15.50 , Citings Type: ACTUAL
Cement:Sacks: 295, Top: 0 ft., Bottom: 2092 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.NN
VERMEJO COAL1536 ft.NN
TRINIDAD1899 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 10/10/2011                Interval Top: 1563 ft.    Interval Bottom: 1790 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:8/17/2011Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/3/2011
Treatment Summary:Acidized w/1,000 gals 15% HCl acid. Frac'd w/34,080 gals 20# Delta 140 w/Sandwedge OS carrying 114,635# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
Perforation Data:
Interval Top:1563 ft.# Of Holes:30
Interval Bottom:1790 ft.Hole Size:0.42 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/21/2011                 Interval Top: 533 ft.    Interval Bottom: 1790 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/17/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:1894 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/21/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 29
BTU_GAS 996
CALC_BBLS_H2O 29
CALC_MCF_GAS 108
CASING_PRESS 17
MCF_GAS 108
TUBING_PRESS 3
Perforation Data:
Interval Top:533 ft.# Of Holes:96
Interval Bottom:1790 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/10/2011                Interval Top: 533 ft.    Interval Bottom: 828 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/17/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/3/2011
Treatment Summary:Acidized w/2,000 gals 15% HCl acid. Frac'd w/114,931 gals 20# Delta 140 w/Sandwedge OS carrying 299,681# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:533 ft.# Of Holes:66
Interval Bottom:828 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)34685
GOR
GOR DeterminationMCFE
Average BOE per Day16.378
Average MCFE per Day94.997

 Federal Financial Assurance  i 

 Tribal Well  i No