Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09867
Well Classification: CBM Status: PR - 7/12/2012
Well Name/No:APACHE CANYON #20-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/12/2012
FacilityID:423376LocationID:423377
County:LAS ANIMAS #071Location:SWSE 20 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8049 ft.
Basin:RATON BASIN  
Planned Location:81FSL  2443 FELLat/Long: 37.062735 / -104.910550Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.062730 / -104.910578Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/11/2012
End Date: 6/11/2012
Reported: 7/2/2012
Days to report: 21
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/12/2012             Measured TD: 2566 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/12/2012
Wellbore Permit
Permit #: Expiration Date:5/28/2013
Proposed Depth/Form:2566 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 45 ft., Weight: 54 , Citings Type: PLANNED
Cement:Sacks: 98, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 285 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 190, Top: 0 ft., Bottom: 285 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2566 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 1864 ft., Bottom: 2566 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1864 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 1864 ft.

Wellbore Completed
Completion Date:6/26/2011
Spud Date:6/24/2011Spud Date Is:ACTUAL
Measured TD:2566 ft.Measured PB depth:2492 ft.
True Vertical TD:True Vertical PB depth:
Log Types:OH, CBL
Log Types:OH, CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: 54.50 , Citings Type: ACTUAL
Cement:Sacks: 65, Top: 0 ft., Bottom: 46 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 500 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 205, Top: 0 ft., Bottom: 500 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2539 ft., Weight: 15.50 , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 1570 ft., Bottom: 2539 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 916 ft., Depth: 1511 ft., Bottom: 1511 ft., Sacks: 200, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: , Bottom: 916 ft., Sacks: 140, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.NN
VERMEJO COAL1994 ft.NN
TRINIDAD2349 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/12/2012                 Interval Top: 505 ft.    Interval Bottom: 2288 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/5/2012Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/1/2012Treatment End Date:6/11/2012
Treatment Summary:Pumped 4750 gals 15% HCl acid. Frac'd w/268,364 gals 20# Delta 140 w/sandwedge OS carrying 468,820# 16/30 Brady sand.
Total fluid used in treatment (bbls):6390Max pressure during treatment (psi):2778
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:5
Total acid used in treatment (bbls):114Min frac gradient (psi/ft):1.34
Recycled water used in treatment (bbls):6391Total flowback volume recovered (bbls):25959
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):468820Green completions techniques utilized:--
Reason green techniques Not utilized: PRESSURE
Tubing Size:2.875 in.Tubing Setting Depth:2361 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/12/2012Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1009
CALC_BBLS_H2O 114
CALC_MCF_GAS 26
CASING_PRESS 21
GRAVITY_OIL 1
TUBING_PRESS 3
Perforation Data:
Interval Top:505 ft.# Of Holes:116
Interval Bottom:2288 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)30216
GOR
GOR DeterminationMCFE
Average BOE per Day14.268
Average MCFE per Day82.762

 Federal Financial Assurance  i 

 Tribal Well  i No