Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09864
Well Classification: CBM Status: PR - 8/7/2012
Well Name/No:APACHE CANYON #20-03
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/7/2012
FacilityID:423123LocationID:423142
County:LAS ANIMAS #071Location:NENW 20 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7725 ft.
Basin:RATON BASIN  
Planned Location:668FNL  1435 FWLLat/Long: 37.075179 / -104.915362Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.075178 / -104.915359Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/2/2012
End Date: 7/2/2012
Reported: 7/19/2012
Days to report: 17
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/7/2012             Measured TD: 2245 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/7/2012
Wellbore Permit
Permit #: Expiration Date:5/9/2013
Proposed Depth/Form:2240 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 45 ft., Weight: 54 , Citings Type: PLANNED
Cement:Sacks: 98, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 400 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 260, Top: 0 ft., Bottom: 400 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2240 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 1538 ft., Bottom: 2240 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1538 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 240, Top: 0 ft., Bottom: 1538 ft.

Wellbore Completed
Completion Date:6/29/2011
Spud Date:6/26/2011Spud Date Is:ACTUAL
Measured TD:2245 ft.Measured PB depth:2176 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AI/SFE, CPH/CN/BD, CBL
Log Types:AI/SFE, CPH/CN/BD, CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: 54.50 , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 0 ft., Bottom: 46 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 500 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 500 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2223 ft., Weight: 15.50 , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 28 ft., Bottom: 2223 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 1539 ft., Depth: 1912 ft., Bottom: 1950 ft., Sacks: 75, Method: PERF & PUMP
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.NN
VERMEJO COAL1637 ft.NN
TRINIDAD2016 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/7/2012                  Interval Top: 578 ft.    Interval Bottom: 2001 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/3/2012Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/2/2012Treatment End Date:7/3/2012
Treatment Summary:Pumped 4,000 gals 15% HCl acid. Frac'd w/276,073 gals 20# Delta 140 w/sandwedge OS carrying 477,580# 16/30 Brady sand.
Total fluid used in treatment (bbls):6670Max pressure during treatment (psi):2114
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:4
Total acid used in treatment (bbls):96Min frac gradient (psi/ft):1.52
Recycled water used in treatment (bbls):6575Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):477580Green completions techniques utilized:No
Reason green techniques Not utilized: PRESSURE
Tubing Size:2.875 in.Tubing Setting Depth:2095 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/7/2012Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1002
CALC_BBLS_H2O 109
CALC_MCF_GAS 25
CASING_PRESS 26
GRAVITY_OIL 1
TUBING_PRESS 5
Perforation Data:
Interval Top:578 ft.# Of Holes:112
Interval Bottom:2001 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)39144
GOR
GOR DeterminationMCFE
Average BOE per Day18.500
Average MCFE per Day107.299

 Federal Financial Assurance  i 

 Tribal Well  i No