|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: SI - 2/1/2025 Measured TD: 1923 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM SI - 2/1/2025 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 3/29/2013 | | Proposed Depth/Form: | 1913 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 45 ft., Weight: 54 , Citings Type: PLANNED | | Cement: | Sacks: 98, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 600 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 390, Top: 0 ft., Bottom: 600 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1913 ft., Weight: 15.5 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 1192 ft., Bottom: 1913 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1192 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 190, Top: 0 ft., Bottom: 1192 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/15/2011 | | Spud Date: | 6/13/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 1923 ft. | Measured PB depth: | 1862 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | Open Hole, CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: 54.5 , Citings Type: ACTUAL | | Cement: | Sacks: 65, Top: 0 ft., Bottom: 46 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 634 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 0 ft., Bottom: 634 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1909 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 0 ft., Bottom: 1909 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | | N | N | | VERMEJO COAL | 1304 ft. | | N | N | | TRINIDAD | 1710 ft. | | N | N |
Formation VRMJ Formation Classification: GW Status: SI - 2/1/2025 Interval Top: 1406 ft. Interval Bottom: 1672 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 8/14/2011 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/24/2011 | | Treatment Summary: | Acidized w/2,000 gals 15% HCl acid. Frac'd w/73,619 gals 20# Delta 140 w/Sandwedge OS carrying 230,322# 16/30 Nebraska sd. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1800 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/17/2011 | Test Method: | Pumping | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 36 | | BTU_GAS | 1004 | | CALC_BBLS_H2O | 36 | | CALC_MCF_GAS | 3 | | CASING_PRESS | 51 | | MCF_GAS | 3 | | TUBING_PRESS | 2 |
| | Perforation Data: | | Interval Top: | 1406 ft. | # Of Holes: | 45 | | Interval Bottom: | 1672 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 1304 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.610 |
| Average MCFE per Day | 3.534 |
| Federal Financial Assurance | i | |
|
|