Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09850
Well Classification: GW Status: PR - 3/23/2015
Well Name/No:HILL RANCH #02-08
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/23/2015
FacilityID:421904LocationID:421911
County:LAS ANIMAS #071Location:SENE 2 35S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8947 ft.
Planned Location:2237FNL  702 FELLat/Long: 37.027258 / -104.958110Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.027264 / -104.958101Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/29/2011
End Date: 6/29/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 292
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/23/2015             Measured TD: 2320 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/23/2015
Wellbore Permit
Permit #: Expiration Date:3/6/2013
Proposed Depth/Form:2100 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 48 ft., Weight: 54 , Citings Type: PLANNED
Cement:Sacks: 98, Top: 0 ft., Bottom: 48 ft.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 250 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 160, Top: 0 ft., Bottom: 250 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2300 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 120, Top: 1438 ft., Bottom: 2300 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1438 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 230, Top: 0 ft., Bottom: 1438 ft.

Wellbore Completed
Completion Date:5/29/2011
Spud Date:5/26/2011Spud Date Is:ACTUAL
Measured TD:2320 ft.Measured PB depth:2265 ft.
True Vertical TD:True Vertical PB depth:
Log Types:Triple Combo, CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: 61 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 0 ft., Bottom: 46 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 495 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 210, Top: 0 ft., Bottom: 495 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2312 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 32 ft., Bottom: 2312 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.NN
VERMEJO COAL1592 ft.NN
TRINIDAD1860 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  PR - 3/23/2015                 Interval Top: 1606 ft.    Interval Bottom: 1843 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:3/2/2015Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/29/2011
Treatment Summary:Acidized w/2,000 gals 15% HCl acid. Frac'd w/80,258 gals 20# Delta 140 w/Sandwedge OS carrying 267,941# 16/30 Nebraska sd.
Tubing Size:2.875 in.Tubing Setting Depth:1957 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
Perforation Data:
Interval Top:1606 ft.# Of Holes:51
Interval Bottom:1843 ft.Hole Size:0.42 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  AB - 3/23/2015                 Interval Top: 502 ft.    Interval Bottom: 1843 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 84
CALC_BBLS_H2O 84
CASING_PRESS 4
TUBING_PRESS 25
Perforation Data:
Interval Top:502 ft.# Of Holes:67
Interval Bottom:1843 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 3/23/2015                 Interval Top: 502 ft.    Interval Bottom: 850 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/29/2011
Treatment Summary:Acidized w/750 gals 15% HCl acid. Frac'd w/17,471 gals 20# Delta 140 w/Sandwedge OS carrying 62,588# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:502 ft.# Of Holes:16
Interval Bottom:850 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)16754
GOR
GOR DeterminationMCFE
Average BOE per Day7.921
Average MCFE per Day45.935

 Federal Financial Assurance  i 

 Tribal Well  i No