Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09692
Well Classification: CBM Status: SI - 1/1/2026
Well Name/No:APACHE CANYON #09-08
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2026
FacilityID:300055LocationID:309557
County:LAS ANIMAS #071Location:SENE 9 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7655 ft.
Basin:RATON BASIN  
Planned Location:1925FNL  753 FELLat/Long: 37.100695 / -104.886687Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.100693 / -104.886682Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/20/2012
End Date: 6/20/2012
Reported: 7/2/2012
Days to report: 12
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: SI - 1/1/2026             Measured TD: 2210 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        SI - 1/1/2026
Wellbore Permit
Permit #: Expiration Date:1/27/2013
Proposed Depth/Form:2205 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: , Depth: 45 ft., Weight: 54 , Citings Type: PLANNED
Cement:Sacks: 98, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 525 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 350, Top: 0 ft., Bottom: 525 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2205 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 1510 ft., Bottom: 2205 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1510 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 240, Top: 0 ft., Bottom: 1510 ft.

Wellbore Completed
Completion Date:7/9/2011
Spud Date:7/7/2011Spud Date Is:ACTUAL
Measured TD:2210 ft.Measured PB depth:2138 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AISF, DEN/NEU, CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: 54.50 , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 0 ft., Bottom: 46 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 538 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 0 ft., Bottom: 538 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2185 ft., Weight: 15.50 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 34 ft., Bottom: 2185 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.NN
VERMEJO COAL1643 ft.NN
TRINIDAD1970 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  SI - 1/1/2026                  Interval Top: 542 ft.    Interval Bottom: 1932 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/13/2012Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/20/2012Treatment End Date:6/20/2012
Treatment Summary:Pumped 3,000 gals 15% HCl acid. Frac'd w/204,263 gals 20# Delta 140 w/sandwedge OS carrying 346,940# 16/30 Brady sand.
Total fluid used in treatment (bbls):4936Max pressure during treatment (psi):1561
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:3
Total acid used in treatment (bbls):72Min frac gradient (psi/ft):1.24
Recycled water used in treatment (bbls):4865Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):346940Green completions techniques utilized:--
Reason green techniques Not utilized: PRESSURE
Tubing Size:2.875 in.Tubing Setting Depth:2031 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/17/2012Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1009
CALC_BBLS_H2O 114
CALC_MCF_GAS 30
CASING_PRESS 18
GRAVITY_OIL 1
TUBING_PRESS 80
Perforation Data:
Interval Top:542 ft.# Of Holes:106
Interval Bottom:1932 ft.Hole Size:0.42 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Use
02/24/2025
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No