Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09682
Well Classification: CBM Status: SI - 6/1/2022
Well Name/No:APACHE CANYON #08-06
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date6/1/2022
FacilityID:299642LocationID:309550
County:LAS ANIMAS #071Location:SENW 8 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7820 ft.
Basin:RATON BASIN  
Planned Location:1648FNL  1712 FWLLat/Long: 37.101481 / -104.914435Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.101460 / -104.914439Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/27/2012
End Date: 6/27/2012
Reported: 7/19/2012
Days to report: 22
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: SI - 6/1/2022             Measured TD: 2350 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        SI - 6/1/2022
Wellbore Permit
Permit #: Expiration Date:1/26/2013
Proposed Depth/Form:2350 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: , Depth: 45 ft., Weight: 54 , Citings Type: PLANNED
Cement:Sacks: 98, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 515 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 340, Top: 0 ft., Bottom: 515 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2350 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 1654 ft., Bottom: 2350 ft.
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2350 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 1654 ft., Bottom: 2350 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1654 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 260, Top: 0 ft., Bottom: 1654 ft.

Wellbore Completed
Completion Date:7/13/2011
Spud Date:7/11/2011Spud Date Is:ACTUAL
Measured TD:2350 ft.Measured PB depth:2350 ft.
True Vertical TD:True Vertical PB depth:
Log Types:Neutron, Single Inductin, CBL
Log Types:Neutron, Single Induction, CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 45 ft., Weight: 54.50 , Citings Type: ACTUAL
Cement:Sacks: 88, Top: 0 ft., Bottom: 45 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 519 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 519 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2323 ft., Weight: 15.50 , Citings Type: ACTUAL
Cement:Sacks: 335, Top: 1002 ft., Bottom: 2323 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 995 ft., Bottom: 1002 ft., Sacks: 175, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.NN
VERMEJO COAL1761 ft.NN
TRINIDAD2132 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  SI - 6/1/2022                  Interval Top: 562 ft.    Interval Bottom: 2096 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/19/2012Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/27/2012Treatment End Date:6/28/2012
Treatment Summary:Pumped 6,000 gals 15% HCl acid. Frac'd w/367,375 gals 20# Delta 140 w/sandwedge OS carrying 471,301# 16/30 Brady sand.
Total fluid used in treatment (bbls):8890Max pressure during treatment (psi):3512
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:5
Total acid used in treatment (bbls):143Min frac gradient (psi/ft):1.95
Recycled water used in treatment (bbls):8751Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):471301Green completions techniques utilized:--
Reason green techniques Not utilized: PRESSURE
Tubing Size:2.875 in.Tubing Setting Depth:2157 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/24/2012Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1009
CALC_BBLS_H2O 110
CASING_PRESS 2
GRAVITY_OIL 1
TUBING_PRESS 45
Perforation Data:
Interval Top:562 ft.# Of Holes:152
Interval Bottom:2096 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
11/27/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Use
05/31/2022
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No