Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09681
Well Classification: CBM Status: PR - 9/9/2011
Well Name/No:APACHE CANYON #08-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/9/2011
FacilityID:299641LocationID:309549
County:LAS ANIMAS #071Location:SESW 8 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7960 ft.
Planned Location:680FSL  2052 FWLLat/Long: 37.093375 / -104.913264Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.093377 / -104.913252Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/9/2011
End Date: 8/9/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 251
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 9/9/2011             Measured TD: 2480 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 9/9/2011
Wellbore Permit
Permit #: Expiration Date:1/26/2013
Proposed Depth/Form:2470 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: , Depth: 45 ft., Weight: 54 , Citings Type: PLANNED
Cement:Sacks: 98, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 655 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 430, Top: 0 ft., Bottom: 655 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2470 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 1777 ft., Bottom: 2470 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1777 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 280, Top: , Bottom: 1777 ft.

Wellbore Completed
Completion Date:6/6/2011
Spud Date:6/3/2011Spud Date Is:ACTUAL
Measured TD:2480 ft.Measured PB depth:2408 ft.
True Vertical TD:True Vertical PB depth:
Log Types:Open Hole, CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: 54.50 , Citings Type: ACTUAL
Cement:Sacks: 124, Top: 0 ft., Bottom: 46 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 680 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 270, Top: 0 ft., Bottom: 680 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2450 ft., Weight: 15.50 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 1735 ft., Bottom: 2450 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 775 ft., Depth: , Bottom: 1735 ft., Sacks: 275, Method: 1 INCH
Additional Cement:String Type: 1ST , Top: 36 ft., Depth: , Bottom: 775 ft., Sacks: 104, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.NN
VERMEJO COAL1936 ft.NN
TRINIDAD2265 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 10/21/2011                Interval Top: 1948 ft.    Interval Bottom: 2227 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:8/24/2011Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/9/2011
Treatment Summary:Acidized w/2,000 gals 15% HCl acid. Frac'd w/46,948 gals 20# Delta 140 w/Sandwedge OS carrying 157,067# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
Perforation Data:
Interval Top:1948 ft.# Of Holes:42
Interval Bottom:2227 ft.Hole Size:0.42 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 9/9/2011                  Interval Top: 698 ft.    Interval Bottom: 2227 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/24/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2322 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/9/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 105
BTU_GAS 1004
CALC_BBLS_H2O 105
CALC_MCF_GAS 87
CASING_PRESS 1
MCF_GAS 87
TUBING_PRESS 4
Perforation Data:
Interval Top:698 ft.# Of Holes:129
Interval Bottom:2227 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/21/2011                Interval Top: 698 ft.    Interval Bottom: 1202 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/24/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/10/2011
Treatment Summary:Acidized w/3,000 gals 15% HCl acid. Frac'd w/153,255 gals 20# Delta 140 w/Sandwedge OS carrying 404,109# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:698 ft.# Of Holes:87
Interval Bottom:1202 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)37879
GOR
GOR DeterminationMCFE
Average BOE per Day17.876
Average MCFE per Day103.663

 Federal Financial Assurance  i 

 Tribal Well  i No