Wellbore #00 Wellbore Classification: CBM Status: PR - 9/9/2011 Measured TD: 2480 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 9/9/2011 | Wellbore Permit | | Permit #: | | Expiration Date: | 1/26/2013 | Proposed Depth/Form: | 2470 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: , Depth: 45 ft., Weight: 54 , Citings Type: PLANNED | Cement: | Sacks: 98, Top: 0 ft., Bottom: 45 ft. | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 655 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 430, Top: 0 ft., Bottom: 655 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2470 ft., Weight: 15.5 , Citings Type: PLANNED | Cement: | Sacks: 100, Top: 1777 ft., Bottom: 2470 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1777 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 280, Top: , Bottom: 1777 ft. |
| | |
Wellbore Completed | Completion Date: | 6/6/2011 | Spud Date: | 6/3/2011 | Spud Date Is: | ACTUAL | Measured TD: | 2480 ft. | Measured PB depth: | 2408 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | Open Hole, CBL | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: 54.50 , Citings Type: ACTUAL | Cement: | Sacks: 124, Top: 0 ft., Bottom: 46 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 680 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 270, Top: 0 ft., Bottom: 680 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2450 ft., Weight: 15.50 , Citings Type: ACTUAL | Cement: | Sacks: 370, Top: 1735 ft., Bottom: 2450 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 775 ft., Depth: , Bottom: 1735 ft., Sacks: 275, Method: 1 INCH | Additional Cement: | String Type: 1ST , Top: 36 ft., Depth: , Bottom: 775 ft., Sacks: 104, Method: 1 INCH | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | | N | N | VERMEJO COAL | 1936 ft. | | N | N | TRINIDAD | 2265 ft. | | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 10/21/2011 Interval Top: 1948 ft. Interval Bottom: 2227 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | 8/24/2011 | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/9/2011 | Treatment Summary: | Acidized w/2,000 gals 15% HCl acid. Frac'd w/46,948 gals 20# Delta 140 w/Sandwedge OS carrying 157,067# 16/30 Nebraska sd. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation VRMJ. |
| Perforation Data: | Interval Top: | 1948 ft. | # Of Holes: | 42 | Interval Bottom: | 2227 ft. | Hole Size: | 0.42 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 9/9/2011 Interval Top: 698 ft. Interval Bottom: 2227 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 8/24/2011 | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2322 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/9/2011 | Test Method: | Pumping | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 105 | BTU_GAS | 1004 | CALC_BBLS_H2O | 105 | CALC_MCF_GAS | 87 | CASING_PRESS | 1 | MCF_GAS | 87 | TUBING_PRESS | 4 |
| Perforation Data: | Interval Top: | 698 ft. | # Of Holes: | 129 | Interval Bottom: | 2227 ft. | Hole Size: | 0.42 in. |
|
Formation RTON Formation Classification: GW Status: CM - 10/21/2011 Interval Top: 698 ft. Interval Bottom: 1202 ft. Completed Information for Formation RATON COAL | 1st Production Date: | 8/24/2011 | Choke Size: | | Formation Name: | RATON COAL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/10/2011 | Treatment Summary: | Acidized w/3,000 gals 15% HCl acid. Frac'd w/153,255 gals 20# Delta 140 w/Sandwedge OS carrying 404,109# 16/30 Nebraska sd. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation RTON. |
| Perforation Data: | Interval Top: | 698 ft. | # Of Holes: | 87 | Interval Bottom: | 1202 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 37879 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 17.876 |
Average MCFE per Day | 103.663 |
Federal Financial Assurance | i | |
|
|