Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09675
Well Classification: CBM Status: SI - 1/1/2025
Well Name/No:APACHE CANYON #08-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2025
FacilityID:299604LocationID:309543
County:LAS ANIMAS #071Location:NWSE 8 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7501 ft.
Planned Location:1848FSL  1964 FELLat/Long: 37.096578 / -104.908932Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.096582 / -104.908931Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/2/2011
End Date: 8/2/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 258
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: SI - 1/1/2025             Measured TD: 2055 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        SI - 1/1/2025
Wellbore Permit
Permit #: Expiration Date:1/26/2013
Proposed Depth/Form:2031 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: , Depth: 45 ft., Weight: 54 , Citings Type: PLANNED
Cement:Sacks: 98, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 250 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 160, Top: 0 ft., Bottom: 250 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2031 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 1333 ft., Bottom: 2031 ft.
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1333 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 210, Top: 0 ft., Bottom: 1333 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1333 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 210, Top: 0 ft., Bottom: 1333 ft.

Wellbore Completed
Completion Date:6/3/2011
Spud Date:6/1/2011Spud Date Is:ACTUAL
Measured TD:2055 ft.Measured PB depth:1992 ft.
True Vertical TD:True Vertical PB depth:
Log Types:Triple Combo, Array Induction, CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 45 ft., Weight: 54.50 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 45 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 500 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 275 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2033 ft., Weight: 15.50 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 976 ft., Bottom: 2033 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 376 ft., Depth: , Bottom: 976 ft., Sacks: 130, Method: 1 INCH
Additional Cement:String Type: 1ST , Top: 18 ft., Depth: 572 ft., Bottom: 572 ft., Sacks: 60, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.NN
VERMEJO COAL1443 ft.NN
TRINIDAD1776 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 9/30/2011                 Interval Top: 1511 ft.    Interval Bottom: 1766 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:8/19/2011Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/2/2011
Treatment Summary:Acidized w/1,000 gals 15% HCl acid. Frac'd w/29,406 gals 20# Delta 140 w/Sandwedge OS carrying 102,588# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
Perforation Data:
Interval Top:1511 ft.# Of Holes:24
Interval Bottom:1766 ft.Hole Size:0.42 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  SI - 12/1/2024                 Interval Top: 569 ft.    Interval Bottom: 1766 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/19/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:1857 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/27/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 989
CALC_MCF_GAS 61
CASING_PRESS 4
MCF_GAS 61
TUBING_PRESS 5
Perforation Data:
Interval Top:569 ft.# Of Holes:72
Interval Bottom:1766 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 9/30/2011                 Interval Top: 569 ft.    Interval Bottom: 1200 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/19/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/8/2011
Treatment Summary:Acidized w/2,000 gals 15% HCl acid. Frac'd w/79,966 gals 20# Delta 140 w/Sandwedge OS carrying 215,130# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:569 ft.# Of Holes:48
Interval Bottom:1200 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)7479
GOR
GOR DeterminationMCFE
Average BOE per Day3.509
Average MCFE per Day20.347

 Federal Financial Assurance  i 

 Tribal Well  i No