Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09635
Well Classification: CBM Status: PR - 2/21/2009
Well Name/No:APACHE CANYON #03-15-67
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/21/2009
FacilityID:297300LocationID:309513
County:LAS ANIMAS #071Location:SWSE 3 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7257 ft.
Planned Location:945FSL  2130 FELLat/Long: 37.108558 / -104.873310Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.108530 / -104.873253Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/21/2009             Measured TD: 1780 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/21/2009
Wellbore Permit
Permit #:20083506 Expiration Date:7/21/2009
Proposed Depth/Form:1790 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1790 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 1092 ft., Bottom: 1790 ft.
Casing:String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1092 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 170, Top: 0 ft., Bottom: 1092 ft.

Wellbore Completed
Completion Date:8/25/2008
Spud Date:8/22/2008Spud Date Is:ACTUAL
Measured TD:1780 ft.Measured PB depth:1745 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUC, COMP DENSITY NEUTRON W/GR & CALIPER, GR/CBL/CCL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 44 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 76, Top: 0 ft., Bottom: 47 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 455 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 221, Top: 0 ft., Bottom: 465 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1757 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 212, Top: 0 ft., Bottom: 1780 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1267 ft.NN
VERMEJO COAL1267 ft.1611 ft.NN
TRINIDAD1611 ft.1780 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 2/21/2009                 Interval Top: 496 ft.    Interval Bottom: 1550 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:2/21/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/30/2009
Treatment Summary:ACIDIZED W/2,200 GALS 15% HCI ACID. FRAC'D W/82,017 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 118,724# 16/30 BRADY SD & 76,600# 12/20 BRADY SD.
Tubing Size:2.875 in.Tubing Setting Depth:1630 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/21/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 77
BTU_GAS 1008
CALC_BBLS_H2O 77
CALC_MCF_GAS 40
CASING_PRESS 13
MCF_GAS 40
TUBING_PRESS 5
Perforation Data:
Interval Top:496 ft.# Of Holes:69
Interval Bottom:1550 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)12417
GOR
GOR DeterminationMCFE
Average BOE per Day5.865
Average MCFE per Day34.013

 Federal Financial Assurance  i 

 Tribal Well  i No