Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09631
Well Classification: CBM Status: PR - 7/1/2021
Well Name/No:GOLDEN EAGLE #32-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2021
FacilityID:297296LocationID:309509
County:LAS ANIMAS #071Location:SWSE 32 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7784 ft.
Basin:RATON BASIN  
Planned Location:770FSL  1766 FELLat/Long: 37.122612 / -104.908121Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.122634 / -104.908147Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/1/2021             Measured TD: 2425 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/1/2021
Wellbore Permit
Permit #:20083507 Expiration Date:7/21/2009
Proposed Depth/Form:2329 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1600 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 250, Top: 0 ft., Bottom: 1600 ft.

Wellbore Completed
Completion Date:8/8/2008
Spud Date:8/5/2008Spud Date Is:ACTUAL
Measured TD:2425 ft.Measured PB depth:2355 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUC, COMP DENSITY NEUTRON W/GR & CALIPER, GR/CBL/CCL (2)
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 168, Top: 0 ft., Bottom: 50 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 500 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 254, Top: 0 ft., Bottom: 505 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2407 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 278, Top: 736 ft., Bottom: 2425 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: 5.5 in., Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 155, Top: 0 ft., Bottom: 710 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1746 ft.NN
VERMEJO COAL1746 ft.2119 ft.NN
TRINIDAD2119 ft.2261 ft.NN
PIERRE2261 ft.2425 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/1/2021                  Interval Top: 518 ft.    Interval Bottom: 2097 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:1/29/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/14/2009
Treatment Summary:ACIDIZED W/5,000 GALS 15% HCI ACID. FRAC'D W/275,836 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 175,100# 16/30 BRADY SD AND 417,700# 12/20 BRADY SD.
Tubing Size:2.875 in.Tubing Setting Depth:2199 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/29/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 121
BTU_GAS 966
CALC_BBLS_H2O 121
CASING_PRESS 6
GRAVITY_OIL 1
TUBING_PRESS 8
Perforation Data:
Interval Top:518 ft.# Of Holes:108
Interval Bottom:2097 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)10627
GOR
GOR DeterminationMCFE
Average BOE per Day5.023
Average MCFE per Day29.139

 Federal Financial Assurance  i 

 Tribal Well  i No