|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 2/13/2008 Measured TD: 2000 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 2/13/2008 | Wellbore Permit | | Permit #: | 20081055 | Expiration Date: | 4/23/2009 | Proposed Depth/Form: | 1889 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 7/21/2008 | Spud Date: | 7/18/2008 | Spud Date Is: | ACTUAL | Measured TD: | 2000 ft. | Measured PB depth: | 1950 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DUAL IND, COMP DENS NEUTRON W/GR & CALIPER, GR/CBL/CCL | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 88, Top: 0 ft., Bottom: 50 ft., Determination Method: CALC | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 468 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 240, Top: 0 ft., Bottom: 472 ft., Determination Method: CBL | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1996 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 226, Top: 0 ft., Bottom: 2000 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1323 ft. | N | N | VERMEJO COAL | 1323 ft. | 1673 ft. | N | N | TRINIDAD | 1673 ft. | 1895 ft. | N | N | PIERRE | 1895 ft. | 2000 ft. | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 2/12/2009 Interval Top: 510 ft. Interval Bottom: 1661 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 2/12/2009 | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/26/2008 | Treatment Summary: | ACIDIZED W/3,250 GALS 15% HCI ACID. FRAC'D W/200,713 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 232,418# 16/30 BRADY SD & 113,200# 12/20 BRADY SD. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1763 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/12/2009 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 100 | BTU_GAS | 1002 | CASING_PRESS | 8 | TUBING_PRESS | 8 |
| Perforation Data: | Interval Top: | 510 ft. | # Of Holes: | 82 | Interval Bottom: | 1661 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 2493 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 1.180 |
Average MCFE per Day | 6.828 |
Federal Financial Assurance | i | |
|
|