Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09569
Well Classification: CBM Status: PR - 8/1/2011
Well Name/No:APACHE CANYON #04-09
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2011
FacilityID:295528LocationID:309466
County:LAS ANIMAS #071Location:NESE 4 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7474 ft.
Basin:RATON BASIN  
Planned Location:1880FSL  136 FELLat/Long: 37.111140 / -104.884575Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.111122 / -104.884555Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/1/2011             Measured TD: 2075 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/1/2011
Wellbore Permit
Permit #:20081057 Expiration Date:4/14/2009
Proposed Depth/Form:2004 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1305 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 210, Top: 0 ft., Bottom: 1305 ft.

Wellbore Completed
Completion Date:8/1/2008
Spud Date:7/30/2008Spud Date Is:ACTUAL
Measured TD:2075 ft.Measured PB depth:1998 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL IND, COMP DENS NEUT W/GR & CALIPER, GR/CBL/CCL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 47 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 151, Top: 0 ft., Bottom: 50 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 501 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 0 ft., Bottom: 505 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2043 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 241, Top: 0 ft., Bottom: 2075 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1342 ft.NN
VERMEJO COAL1443 ft.1796 ft.NN
TRINIDAD1796 ft.2005 ft.NN
PIERRE2005 ft.2075 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/1/2011                  Interval Top: 511 ft.    Interval Bottom: 1786 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:2/7/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/22/2009
Treatment Summary:ACIDIZED W/5,000 GALS 15% HCI ACID. FRAC'D W/191,948 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 290,300# 16/30 BRANDY SAND & 185,300# 12/20 BRANDY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1864 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/7/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 57
BTU_GAS 1004
CALC_BBLS_H2O 57
CASING_PRESS 10
TUBING_PRESS 3
Perforation Data:
Interval Top:511 ft.# Of Holes:112
Interval Bottom:1786 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)24071
GOR
GOR DeterminationMCFE
Average BOE per Day11.369
Average MCFE per Day65.958

 Federal Financial Assurance  i 

 Tribal Well  i No