Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09568
Well Classification: CBM Status: PR - 4/9/2010
Well Name/No:HILL RANCH #31-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/9/2010
FacilityID:295529LocationID:309465
County:LAS ANIMAS #071Location:SESE 31 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8558 ft.
Basin:RATON BASIN  
Planned Location:1213FSL  381 FELLat/Long: 37.036856 / -104.921552Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.036857 / -104.921547Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 4/9/2010             Measured TD: 2758 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 4/9/2010
Wellbore Permit
Permit #:20091727 Expiration Date:4/27/2010
Proposed Depth/Form:2758 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2053 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 320, Top: 0 ft., Bottom: 2053 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 2053 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 320, Top: 0 ft., Bottom: 2053 ft.

Wellbore Completed
Completion Date:2/2/2010
Spud Date:1/30/2010Spud Date Is:ACTUAL
Measured TD:2758 ft.Measured PB depth:2638 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUCTION, COMPENSATED DENSITY/NEUTRON, CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 48 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 84, Top: 0 ft., Bottom: 50 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 455 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 235, Top: 0 ft., Bottom: 460 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2726 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 435, Top: 50 ft., Bottom: 2758 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.NN
VERMEJO COAL2240 ft.NN
TRINIDAD2570 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/1/2011                  Interval Top: 677 ft.    Interval Bottom: 2500 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:4/9/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/23/2010
Treatment Summary:ACIDIZED WITH 4000 GALS 15% HCI ACID. FRACD WITH 165931 GALS DELTA 140 WITH SANDWEDGE OS CARRYING 30316# 16/30 BRADY SD AND 380667# 12/20 BRADY SD.
Tubing Size:2.875 in.Tubing Setting Depth:2552 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/9/2010Test Method:PUIMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 114
BTU_GAS 989
CALC_BBLS_H2O 114
CALC_MCF_GAS 22
CASING_PRESS 5
MCF_GAS 22
TUBING_PRESS 3
Perforation Data:
Interval Top:677 ft.# Of Holes:104
Interval Bottom:2500 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)20757
GOR
GOR DeterminationMCFE
Average BOE per Day9.807
Average MCFE per Day56.877

 Federal Financial Assurance  i 

 Tribal Well  i No