Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09560
Well Classification: CBM Status: PR - 7/10/2009
Well Name/No:HILL RANCH #01-02
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/10/2009
FacilityID:295517LocationID:309458
County:LAS ANIMAS #071Location:NWNE 1 35S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8627 ft.
Basin:RATON BASIN  
Planned Location:820FNL  1919 FELLat/Long: 37.031244 / -104.944204Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.031269 / -104.944197Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/10/2009             Measured TD: 2637 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/10/2009
Wellbore Permit
Permit #:20081045 Expiration Date:4/13/2009
Proposed Depth/Form:2577 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 55.5 in., Top: , Depth: 1895 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 0 ft., Bottom: 1895 ft.

Wellbore Completed
Completion Date:3/14/2009
Spud Date:3/9/2009Spud Date Is:ACTUAL
Measured TD:2637 ft.Measured PB depth:2543 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUC, COMP DENSITY NEUTRON, CBL, GR/NEU, COMP NEU
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 44 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 60, Top: 0 ft., Bottom: 60 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 454 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 195, Top: 0 ft., Bottom: 460 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2585 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 116, Top: 1790 ft., Bottom: 2637 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1782 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 590 ft., Bottom: 1782 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 545 ft., Bottom: 545 ft., Sacks: 120, Method: STAGE TOOL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2059 ft.NN
VERMEJO COAL2059 ft.2320 ft.NN
TRINIDAD2320 ft.2411 ft.NN
PIERRE2411 ft.2637 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/10/2009                 Interval Top: 557 ft.    Interval Bottom: 2285 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/7/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/17/2009
Treatment Summary:ACIDIZED W/5,400 GALS 15% HCL ACID. FRAC'D W/283,021 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 37,800# 16/30 BRADY SD & 424,900# 12/20 BRADY SD.
Tubing Size:2.875 in.Tubing Setting Depth:2394 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/10/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 93
BBLS_OIL 0
BTU_GAS 1005
CALC_BBLS_H2O 93
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 4
CASING_PRESS 3
MCF_GAS 4
TUBING_PRESS 2
Perforation Data:
Interval Top:557 ft.# Of Holes:118
Interval Bottom:2285 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)15597
GOR
GOR DeterminationMCFE
Average BOE per Day7.387
Average MCFE per Day42.831

 Federal Financial Assurance  i 

 Tribal Well  i No