Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09539
Well Classification: CBM Status: PR - 8/22/2008
Well Name/No:GOLDEN EAGLE #34-06
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/22/2008
FacilityID:295033LocationID:309444
County:LAS ANIMAS #071Location:SENW 34 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7467 ft.
Planned Location:1733FNL  1557 FWLLat/Long: 37.131029 / -104.878404Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.131096 / -104.878313Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/22/2008             Measured TD: 2200 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/22/2008
Wellbore Permit
Permit #:20080587 Expiration Date:3/17/2009
Proposed Depth/Form:2102 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1386 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 220, Top: 0 ft., Bottom: 1386 ft.

Wellbore Completed
Completion Date:7/12/2008
Spud Date:7/9/2008Spud Date Is:ACTUAL
Measured TD:2200 ft.Measured PB depth:2126 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUC, COMP DENSITY NEUTRON W/ GR AND CALIPER, GR/CBL/CCL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 49 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 81, Top: 0 ft., Bottom: 50 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 483 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 276, Top: 0 ft., Bottom: 490 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2178 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 238, Top: 0 ft., Bottom: 2200 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1524 ft.NN
VERMEJO COAL1524 ft.1907 ft.NN
TRINIDAD1907 ft.2140 ft.NN
PIERRE2140 ft.2200 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/22/2008                 Interval Top: 500 ft.    Interval Bottom: 1830 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/22/2008Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/28/2008
Treatment Summary:ACIDIZED W/ 3000 GALS 15% HCI ACID. FRAC'D W/ 166412 GALS 20# DELTA 140 W/ SANDWEDGE OS CARRYING 151569 16/30 BRADY SAND AND 277164 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1964 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/22/2008Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 100
BBLS_OIL 0
BTU_GAS 1011
CALC_BBLS_H2O 100
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 146
CASING_PRESS 20
GRAVITY_OIL 1
MCF_GAS 146
TUBING_PRESS 2
Perforation Data:
Interval Top:500 ft.# Of Holes:87
Interval Bottom:1830 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)22280
GOR
GOR DeterminationMCFE
Average BOE per Day10.518
Average MCFE per Day61.026

 Federal Financial Assurance  i 

 Tribal Well  i No