Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09531
Well Classification: CBM Status: PR - 6/16/2008
Well Name/No:HILL RANCH #36-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/16/2008
FacilityID:295025LocationID:309436
County:LAS ANIMAS #071Location:NESW 36 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7788 ft.
Planned Location:1564FSL  2390 FWLLat/Long: 37.037730 / -104.839730Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.037729 / -104.839785Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 6/16/2008             Measured TD: 2400 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 6/16/2008
Wellbore Permit
Permit #:20080578 Expiration Date:3/17/2009
Proposed Depth/Form:2298 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1659 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 260, Top: 0 ft., Bottom: 1659 ft.

Wellbore Completed
Completion Date:5/4/2008
Spud Date:5/2/2008Spud Date Is:ACTUAL
Measured TD:2400 ft.Measured PB depth:2293 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR/CBL/CCL, DIL, CD/NL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 47 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 60, Top: 0 ft., Bottom: 50 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 466 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 0 ft., Bottom: 467 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2351 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 10 ft., Bottom: 2400 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
POISON CANYON COAL0 ft.234 ft.NN
RATON COAL234 ft.1681 ft.NN
RATON SAND1681 ft.1786 ft.NN
VERMEJO COAL1786 ft.2097 ft.NN
TRINIDAD2097 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 6/16/2008                 Interval Top: 899 ft.    Interval Bottom: 2071 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:6/19/2008Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:6/9/2008
Treatment Summary:PUMPED 4,000 GALS 15% HCI ACID. FRAC'D W/181,446 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 115,420# 16/30 ARIZONA SAND & 159,600# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2125 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/16/2008Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 111
BBLS_OIL 0
BTU_GAS 987
CALC_BBLS_H2O 111
CALC_BBLS_OIL 0
CALC_MCF_GAS 32
CASING_PRESS 35
GRAVITY_OIL 1
MCF_GAS 32
TUBING_PRESS 4
Perforation Data:
Interval Top:899 ft.# Of Holes:80
Interval Bottom:2071 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)8043
GOR
GOR DeterminationMCFE
Average BOE per Day3.793
Average MCFE per Day22.029

 Federal Financial Assurance  i 

 Tribal Well  i No