Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09496
Well Classification: CBM Status: PR - 7/18/2008
Well Name/No:NEW ELK #25-08
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/18/2008
FacilityID:294634LocationID:309410
County:LAS ANIMAS #071Location:SENE 25 33S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:7347 ft.
Planned Location:2103FNL  737 FELLat/Long: 37.143722 / -104.940275Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.143699 / -104.940223Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/18/2008             Measured TD: 1840 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/18/2008
Wellbore Permit
Permit #:20076503 Expiration Date:2/21/2009
Proposed Depth/Form:1802 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1095 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 190, Top: 0 ft., Bottom: 1095 ft.

Wellbore Completed
Completion Date:3/30/2008
Spud Date:3/28/2008Spud Date Is:ACTUAL
Measured TD:1840 ft.Measured PB depth:1760 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUC, COMP DENSITY NEUTRON W/GR & CALIPER, GR/CBL/CCL (2)
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 112, Top: 0 ft., Bottom: 50 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 452 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 227, Top: 0 ft., Bottom: 460 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1807 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 247, Top: 522 ft., Bottom: 1840 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 184 ft., Bottom: 522 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1226 ft.NN
VERMEJO COAL1226 ft.1611 ft.NN
TRINIDAD1611 ft.1840 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/18/2008                 Interval Top: 459 ft.    Interval Bottom: 1593 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/18/2008Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/29/2008
Treatment Summary:ACIDIZED W/ 3000 GALS HCI ACID. FRAC'D W/ 112107 GALS 20# DELTA 140 W/ SANDWEDGE OS CARRYING 202931 16/30 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1666 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/18/2008Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 92
BBLS_OIL 0
BTU_GAS 1007
CALC_BBLS_H2O 92
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 55
CASING_PRESS 30
GRAVITY_OIL 1
MCF_GAS 55
TUBING_PRESS 4
Perforation Data:
Interval Top:459 ft.# Of Holes:70
Interval Bottom:1593 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)23617
GOR
GOR DeterminationMCFE
Average BOE per Day11.151
Average MCFE per Day64.659

 Federal Financial Assurance  i 

 Tribal Well  i No