Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09496
Well Classification: CBM Status: PR - 7/18/2008
Well Name/No:NEW ELK #25-08
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/18/2008
FacilityID:294634LocationID:309410
County:LAS ANIMAS #071Location:SENE 25 33S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:7347 ft.
Basin:RATON BASIN  
Planned Location:2103FNL  737 FELLat/Long: 37.143722 / -104.940275Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.143699 / -104.940223Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/18/2008             Measured TD: 1840 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/18/2008
Wellbore Permit
Permit #:20076503 Expiration Date:2/21/2009
Proposed Depth/Form:1802 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1095 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 190, Top: 0 ft., Bottom: 1095 ft.

Wellbore Completed
Completion Date:3/30/2008
Spud Date:3/28/2008Spud Date Is:ACTUAL
Measured TD:1840 ft.Measured PB depth:1760 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUC, COMP DENSITY NEUTRON W/GR & CALIPER, GR/CBL/CCL (2)
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 112, Top: 0 ft., Bottom: 50 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 452 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 227, Top: 0 ft., Bottom: 460 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1807 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 247, Top: 522 ft., Bottom: 1840 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 184 ft., Bottom: 522 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1226 ft.NN
VERMEJO COAL1226 ft.1611 ft.NN
TRINIDAD1611 ft.1840 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/18/2008                 Interval Top: 459 ft.    Interval Bottom: 1593 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/18/2008Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/29/2008
Treatment Summary:ACIDIZED W/ 3000 GALS HCI ACID. FRAC'D W/ 112107 GALS 20# DELTA 140 W/ SANDWEDGE OS CARRYING 202931 16/30 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1666 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/18/2008Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 92
BBLS_OIL 0
BTU_GAS 1007
CALC_BBLS_H2O 92
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 55
CASING_PRESS 30
GRAVITY_OIL 1
MCF_GAS 55
TUBING_PRESS 4
Perforation Data:
Interval Top:459 ft.# Of Holes:70
Interval Bottom:1593 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)19353
GOR
GOR DeterminationMCFE
Average BOE per Day9.149
Average MCFE per Day53.043

 Federal Financial Assurance  i 

 Tribal Well  i No