Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09479
Well Classification: CBM Status: PR - 7/30/2008
Well Name/No:GOLDEN EAGLE #19-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/30/2008
FacilityID:294316LocationID:309396
County:LAS ANIMAS #071Location:SWSW 19 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7779 ft.
Basin:RATON BASIN  
Planned Location:586FSL  1243 FWLLat/Long: 37.151419 / -104.933493Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.151435 / -104.933472Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/30/2008             Measured TD: 2400 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/30/2008
Wellbore Permit
Permit #:20076608 Expiration Date:1/9/2009
Proposed Depth/Form:2369 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1631 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 1631 ft.

Wellbore Completed
Completion Date:3/25/2008
Spud Date:3/22/2008Spud Date Is:ACTUAL
Measured TD:2400 ft.Measured PB depth:2310 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL IND.,COMP.DENSITY/NEUTRON W/GR & CALIPER, GR/CBL/CCL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 85, Top: 0 ft., Bottom: 50 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 768 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 352, Top: 0 ft., Bottom: 775 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2364 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 336, Top: 30 ft., Bottom: 2400 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
POISON CANYON COAL0 ft.190 ft.NN
RATON COAL190 ft.1769 ft.NN
VERMEJO COAL1769 ft.2169 ft.NN
TRINIDAD2169 ft.2400 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/30/2008                 Interval Top: 826 ft.    Interval Bottom: 2144 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/30/2008Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/14/2008
Treatment Summary:ACIDIZED W/5,000 GALS 15% HCI ACID. FRAC'D W/212,260 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 168,462# 16/30 BRADY SAND & 245,666# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2230 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/30/2008Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 84
BBLS_OIL 0
BTU_GAS 1008
CALC_BBLS_H2O 84
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 0
CASING_PRESS 10
GRAVITY_OIL 1
MCF_GAS 0
TUBING_PRESS 4
Perforation Data:
Interval Top:826 ft.# Of Holes:106
Interval Bottom:2144 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)10547
GOR
GOR DeterminationMCFE
Average BOE per Day4.985
Average MCFE per Day28.919

 Federal Financial Assurance  i 

 Tribal Well  i No