Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09473
Well Classification: CBM Status: PR - 2/7/2018
Well Name/No:NEW ELK #24-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/7/2018
FacilityID:294298LocationID:309390
County:LAS ANIMAS #071Location:SESE 24 33S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:7693 ft.
Basin:RATON BASIN  
Planned Location:517FSL  1045 FELLat/Long: 37.150907 / -104.941340Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.150971 / -104.941255Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/10/2018
End Date: 1/11/2018
Reported: 1/26/2018
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/7/2018             Measured TD: 2305 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/7/2018
Wellbore Permit
Permit #:20076501 Expiration Date:1/9/2009
Proposed Depth/Form:2223 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1514 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 270, Top: 0 ft., Bottom: 1514 ft.

Wellbore Completed
Completion Date:3/14/2008
Spud Date:3/11/2008Spud Date Is:ACTUAL
Measured TD:2305 ft.Measured PB depth:2223 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUC, COMP DENSITY NEUTRON, GR/CBL/CCL (2)
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 95, Top: 0 ft., Bottom: 50 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 497 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 0 ft., Bottom: 500 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2285 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 990 ft., Bottom: 2305 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 438, Top: 34 ft., Bottom: 875 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1600 ft.NN
VERMEJO COAL1600 ft.1958 ft.NN
TRINIDAD1958 ft.2305 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 2/7/2018                  Interval Top: 578 ft.    Interval Bottom: 1943 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/21/2008Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/11/2018Treatment End Date:1/11/2018
Treatment Summary:Originally perforated six Vermejo Coal intervals with 4 SPF and 120 degree phasing including Stage 1 - 1,940' - 43', Stage 2 - 1,892' - 94' and 1,902' - 04', Stage 3 - 1,841' - 43', Stage 4 - 1,747' - 52', Stage 5 - 1,648' - 51' and 1,664' - 1,666' and Stage 6 - 1,602' - 605' (net - 22' or 88 holes) with 4 SPF and 120 degree phasing. Isolation stage tool had a problem going through the casing at approximatley 1,600' GL. TCE elected to skip the Vermejo Coals and proceed to frac the Raton Coals. Perforated five Raton Coal intervals with 4 SPF and 120 degree phasing including Stage 7 - 800' - 06', Stage 8 - 758' - 64', Stage 9 - 701' - 06', 715' - 18' and 721' - 24', Stage 10 - 645' - 50' (net - and Stage 11 - 578' - 80' and 592' - 95' with Coil Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 153,946 gallons of produced water, 205,687 lbs of 20/40 mesh Premium White Sand and 377,327 scf N2 were pumped. All five fracs were pumped according to prognosis. The CTU rigged down and moved to next location. Well was cleaned out to 1,600' GL and well returned to production as a commingled Raton - Vermejo Coal well.
Total fluid used in treatment (bbls):3665Max pressure during treatment (psi):2045
Total gas used in treatment (mcf):377327Fluid density (lbs/gal):8.35
Type Of gas:NITROGENNumber Of staged intervals:5
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):3665Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):205687Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:6/24/2008
Treatment Summary:ACIDIZED W/6,000 GALS 15% HCI ACID. FRAC'D W/307,836 GALS 20# DELTA 140 W/SANDWEDGE OS CARYING 108,434# 16/30 BRADY SAND AND 268,912# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2031 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/18/2018Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 121
BTU_GAS 972
CALC_BBLS_H2O 121
CASING_PRESS 4
GRAVITY_OIL 1
TUBING_PRESS 3
Perforation Data:
Interval Top:578 ft.# Of Holes:220
Interval Bottom:1943 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)13702
GOR
GOR DeterminationMCFE
Average BOE per Day6.473
Average MCFE per Day37.536

 Federal Financial Assurance  i 

 Tribal Well  i No