Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09472
Well Classification: CBM Status: SI - 2/1/2025
Well Name/No:NEW ELK #24-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date2/1/2025
FacilityID:294297LocationID:309389
County:LAS ANIMAS #071Location:SWSE 24 33S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:7955 ft.
Planned Location:666FSL  2354 FELLat/Long: 37.151288 / -104.945831Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.151285 / -104.945773Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/8/2018
End Date: 1/9/2018
Reported: 1/26/2018
Days to report: 17
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: SI - 2/1/2025             Measured TD: 2480 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        SI - 2/1/2025
Wellbore Permit
Permit #:20076504 Expiration Date:1/9/2009
Proposed Depth/Form:2425 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1713 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 0 ft., Bottom: 1713 ft.

Wellbore Completed
Completion Date:3/22/2008
Spud Date:3/19/2008Spud Date Is:ACTUAL
Measured TD:2480 ft.Measured PB depth:2395 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUC, COMP DENSITY NEUTRON W/GR & CALIPER, GR/CBL/CCL (2)
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 76, Top: 0 ft., Bottom: 50 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 764 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 352, Top: 0 ft., Bottom: 770 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2455 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 352, Top: 797 ft., Bottom: 2480 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 322 ft., Bottom: 797 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1792 ft.NN
VERMEJO COAL1792 ft.2177 ft.NN
TRINIDAD2177 ft.2480 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  SI - 2/1/2025                  Interval Top: 799 ft.    Interval Bottom: 2171 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/6/2008Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/8/2018Treatment End Date:2/9/2018
Treatment Summary:Perforated five Vermejo Coal intervals listed by stage with 4 SPF and 120 degree phasing including and fraced five Vermejo Coal intervals including Stage 1 - 2,148' - 51', 2,158' - 62' and 2,169' - 71', Stage 2 - 2,110' - 12' and 2,119' - 21', Stage 3 - 2,049' - 52', Stage 4 - 1,950' - 52' and 1,954' - 58', Stage 5 - 1,802' - 05' (net - 25' or 100 holes) with Coil Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 1,000 gallons of 15% HCl, 157,306 gallons of produced water, 105,325 lbs of 20/40 mesh Premium White Sand and 1,070,433 scf N2 were pumped. Stage 2 screened out on 2 ppg downhole concentration. Perforated five Raton Coal intervals listed by stage with 4 SPF and 120 degree phasing and fraced the five Raton Coal intervals including Stage 6 - 1,014' - 20', Stage 7 - 982' - 87', Stage 8 - 922' - 27', 932' - 34' and 940' -42', Stage 9 - 858' - 63' and Stage 10 - 799' - 02' and 806' - 08' (net - 30' or 120 holes) with Coil Tubing Unit and 2-7/8" coiled tubing to isolate stages. A total of 500 gallons 0f 15% HCl, 115,581 gallons of produced water. 107,958 lbs of 20/40 mesh Premium White Sand and 337,669 scf N2 were pumped. Stage 7 screened out on 2 ppg downhole sand concentration. Stage 9 backside communicated uphole on pad and isolation tool was moved uphole with no sand pumped. The CTU rigged down and moved to nest location. Well was cleaned out to PBTD and returned to production as a commingled Raton-Vermejo well.
Total fluid used in treatment (bbls):6532Max pressure during treatment (psi):2871
Total gas used in treatment (mcf):1408102Fluid density (lbs/gal):8.35
Type Of gas:NITROGENNumber Of staged intervals:10
Total acid used in treatment (bbls):35Min frac gradient (psi/ft):0.51
Recycled water used in treatment (bbls):6497Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):213283Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:7/15/2008
Treatment Summary:ACIDIZED W/4,000 GALS 15% HCI ACID. FRAC'D W/156,443 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 118,861# 16/30 BRADY SAND AND 233,314# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2031 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/17/2018Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 66
BTU_GAS 915
CALC_BBLS_H2O 66
CASING_PRESS 1
GRAVITY_OIL 1
TUBING_PRESS 5
Perforation Data:
Interval Top:799 ft.# Of Holes:220
Interval Bottom:2171 ft.Hole Size:0.45 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)8250
GOR
GOR DeterminationMCFE
Average BOE per Day3.868
Average MCFE per Day22.428

 Federal Financial Assurance  i 

 Tribal Well  i No