Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09450
Well Classification: CBM Status: PR - 5/31/2008
Well Name/No:HILL RANCH EAST #14-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/31/2008
FacilityID:293799LocationID:309369
County:LAS ANIMAS #071Location:SWSE 14 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7906 ft.
Planned Location:1277FSL  2144 FELLat/Long: 37.080454 / -104.855256Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.080454 / -104.855256Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/31/2008             Measured TD: 2514 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/31/2008
Wellbore Permit
Permit #:20075850 Expiration Date:11/28/2008
Proposed Depth/Form:2496 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1794 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 310, Top: 0 ft., Bottom: 1794 ft.

Wellbore Completed
Completion Date:4/5/2008
Spud Date:4/3/2008Spud Date Is:ACTUAL
Measured TD:2514 ft.Measured PB depth:2454 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL IND.LOG/ COMP.DENSITY NEUTRON LOG, CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 81, Top: 0 ft., Bottom: 46 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 451 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 222, Top: 3 ft., Bottom: 451 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2501 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 354, Top: 20 ft., Bottom: 2501 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
POISON CANYON COAL0 ft.401 ft.NN
RATON COAL401 ft.1875 ft.NN
VERMEJO COAL2013 ft.2287 ft.NN
TRINIDAD2287 ft.2514 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/31/2008                 Interval Top: 459 ft.    Interval Bottom: 2212 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:5/30/2008Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:5/12/2008
Treatment Summary:PUMPED 5,000 GALS 15% HCI ACID. FRAC'D W/244,145 GALS 20# DELTA 140 W/SANDWEDGE OC CARRYING 141,756# 16/30 ARIZONA SAND & 343,590# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2300 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 168
BBLS_OIL 0
BTU_GAS 1007
CALC_BBLS_H2O 168
CALC_BBLS_OIL 0
CALC_MCF_GAS 57
CASING_PRESS 4
MCF_GAS 57
TUBING_PRESS 8
Perforation Data:
Interval Top:459 ft.# Of Holes:118
Interval Bottom:2212 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)8570
GOR
GOR DeterminationMCFE
Average BOE per Day4.047
Average MCFE per Day23.482

 Federal Financial Assurance  i 

 Tribal Well  i No