Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09356
Well Classification: CBM Status: PR - 2/8/2018
Well Name/No:NEW ELK #25-01
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/8/2018
FacilityID:291293LocationID:309300
County:LAS ANIMAS #071Location:NENE 25 33S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:7632 ft.
Basin:RATON BASIN  
Planned Location:454FNL  135 FELLat/Long: 37.148260 / -104.938210Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.148240 / -104.938219Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/20/2018
End Date: 1/22/2018
Reported: 1/26/2018
Days to report: 4
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/8/2018             Measured TD: 2225 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/8/2018
Wellbore Permit
Permit #:20072812 Expiration Date:7/8/2008
Proposed Depth/Form:2152 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1432 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 0 ft., Bottom: 1432 ft.

Wellbore Completed
Completion Date:8/8/2007
Spud Date:8/2/2007Spud Date Is:ACTUAL
Measured TD:2225 ft.Measured PB depth:2165 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL IND W/GR; COMP DENSITY NEUTRON W/CALIPER, CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 47 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 78, Top: 0 ft., Bottom: 47 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 496 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 227, Top: 0 ft., Bottom: 496 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2210 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 460 ft., Bottom: 2210 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 460 ft., Depth: 1678 ft., Bottom: 1430 ft., Sacks: 100, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1488 ft.NN
VERMEJO COAL1554 ft.1945 ft.NN
TRINIDAD1945 ft.2225 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 2/8/2018                  Interval Top: 565 ft.    Interval Bottom: 1942 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:2/14/2008Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/21/2018Treatment End Date:1/22/2018
Treatment Summary:Perforate five Vermejo Coal intervals with 4 SPF and 120 degree phasing listed by stage and fraced five Vermejo Coal intervals including Stage 1 - 1,933' - 37' and 1,940' - 42', Stage 2 - 1,883' - 85', 1,891' -93' and 1,907' - 10', Stage 3 - 1,850' - 54', Stage 4 - 1,642' - 45', Stage 5 - 1,586' - 89' and 1,597' - 98' (24' net or 96 holes) with Coil Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 500 gallons of 15% HCl, 138,026 gallons of produced water, 116,367 lbs of 20/40 mesh Premium White Sand and 645,493 scf N2 were pumped. Stage 4 screened out with 1.0 ppg sand downhole concentration. Perforate four Raton Coal intervals with 4 SPF and 120 degree phasing listed by stage and fraced four Raton Coal intervals including Stage 6 - 752' - 58' and 771' - 777', Stage 7 - 677' - 82', 695' - 698' and 700' - 02', Stage 8 - 628' - 32' and Stage 9 - 565' - 67' and 579' - 81' (net - 30' or 120 holes) with Coil Tubing Unit and 2-7/8" coiled tubing to isolate stages. A total of 177,726 gallons of produced water, 251,542 lbs of 20/40 mesh Premium White Sand and 580,386 scf N2 were pumped. All four stages were pumped according to prognosis. In addition, TCE perforated three intervals with 4 SPF and 120 degree phasing that were not fraced. The three Vermejo Coal intervals were 1,809' - 14', 1,816' - 25' and 1,828' - 31' (net 17' or 68 holes). The intervales were not fraced. The CTU rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton-Vermejo well.
Total fluid used in treatment (bbls):7529Max pressure during treatment (psi):3730
Total gas used in treatment (mcf):1225779Fluid density (lbs/gal):8.35
Type Of gas:NITROGENNumber Of staged intervals:9
Total acid used in treatment (bbls):11Min frac gradient (psi/ft):0.54
Recycled water used in treatment (bbls):7518Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):367909Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:2/5/2007
Treatment Summary:ACIDIZED W/ 3250 GALS 15% HCL FRACD W/ 202.283 GALS 20# DELTA 140 WITH SANDWEDGE OS CARRYING 25,500# 16/30 ARIZONA SAND FOLLOWED BY 42,603# 12/20 ARIZONA SAND
Tubing Size:2.875 in.Tubing Setting Depth:1943 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/7/2018Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 48
BBLS_OIL 0
BTU_GAS 994
CALC_BBLS_H2O 48
CALC_BBLS_OIL 0
CALC_MCF_GAS 1
CASING_PRESS 2
GRAVITY_OIL 1
MCF_GAS 1
TUBING_PRESS 1
Perforation Data:
Interval Top:565 ft.# Of Holes:284
Interval Bottom:1942 ft.Hole Size:0.421875 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)18816
GOR
GOR DeterminationMCFE
Average BOE per Day8.889
Average MCFE per Day51.560

 Federal Financial Assurance  i 

 Tribal Well  i No